My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Cost Sharing Models
>
CS_Courthouse Square
>
Cost Sharing Models
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:02:22 AM
Creation date
8/9/2011 10:07:20 AM
Metadata
Fields
Template:
Building
RecordID
10080
Title
Cost Sharing Models
Company
WEGroup Report 1993
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Design - Planning
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
_-- -- _ --- --- - - - - <br />- -- -- - -- -- <br />- ------ -- -- - <br />-- _ <br />Courthouse Square Architectural Cost Consultants, LLC Estimate Date: R 03- o- <br />Court 8 High Street James A. Jerde, AIA - Stanley J. Pszczotkowskl, AIA Document Date: 29-Od-98 <br />Satem, Oregon 6441 SW Canyon Court, Suite 103 P~int Date: 03-Dec-98 <br />Arbuckle Costic Architects, Inc Portiand, Oregon 97221 Print Time: 11:07 AM <br />50°~ Contract Documents Estimate Phone (503) 297_7210 Fax (503) 297-7187 ___ ______ ____ . ~ Construction Start: Spriny 99 <br />--- <br />- ---- <br />_ . _ _ - ------- <br />----- - _ _ ~ - ---- <br />----- -__. - ------_ <br /> <br />- <br />--- - - --- - - ---------- -__ <br />Ground Level <br />--- -- <br />- - <br /> <br />23,249 <br />31,537 <br />Second Floor 32,088 <br />Third Floor <br />32,088 <br />FouRh Floor 32,012 <br />Fifth Floor ~ 818 <br />Penthouse - <br />Total Gross Area _ <br /> <br />--- ----- <br />--- ---- <br />Buildin Sheli 8_Core <br />------ _ _ _ _ _ <br />- <br />Quantity <br /> <br />Unit_ <br /> <br />_CosWnit <br /> <br />os _ <br /> <br />SPECIALTIES - Continued <br />Fire extinguisher & cabinets <br />FEC 15 ea 235.00 3,525 <br />Subtotal <br />Toilet accessories (incls installation) <br />grab bars 8 sets 135.00 1,080 <br />mirrors <br />elect hand dryer <br />16 ea <br />ea ~ 0.00 <br />375.00 0 <br />6,000 <br />janitor tool holder 4 ea 80.00 320 <br />sanitary napkin dispenser 4 ea 375.00 1,500 <br />sanitary napkin disposal 16 ea 38.00 608 <br />hooks 24 ea 15.00 360 <br />purse shelf 16 ea 55.00 880 <br />toilet paper dispenser 24 ea 50.00 1,200 <br />seat cover dispenser 24 ea 65.00 1,560 <br />soap dispenser 16 ea 45.00 720 <br />Subtotal <br />Wndow Washing Equipment <br />swing stage, tie backs & roof anchors 1 sum 15,000.00 _ 15,000 <br />Subtotal <br />TOTAL - SPECIALTIES ___ __ _ __ _ _-__ __ <br /> <br /> -- <br /> EQUIPMENT ----- ------ --- --- <br /> Security / Vault Equipment <br />1 <br />00 <br />000 <br />72 <br />000 <br />72 <br /> security system - basic bldg card access sum _ <br />. <br />, _ <br />, <br />_ <br /> Subtotal <br /> Loading Dock Equipment <br />1 <br />sum <br />500 <br />00 <br />500 <br /> dock bumpers . _ <br /> Subtotal <br />_ _- <br /> ~ <br />-- - -- -_ <br />-- - - - <br />_ _TOTAL - EQUIPMENT _ <br /> <br />- <br /> <br />_ <br />- <br />_.- <br /> <br /> <br />_ _-- <br /> <br /> <br />- --------- <br />15 <br />Total <br />Comments <br />~o ao ao ~ ao ~ ss,525 <br />14,228 0 0 0 0 <br />15,000 SO 30 30 30 <br />s~.173 so so ao so <br />72,00o so ao so so <br />0 ~ <br />-- soo ao ao so ao <br />,72.500 SO SO 30 SO <br />~,oso <br />o see glazing above <br />s,ooo <br />320 <br />1,500 <br />sos <br />360 <br />S8o <br />~ ,200 <br />1,560 <br />720 <br />14.228 <br />15,000 <br />515,000 <br />as~.,~s o.sa <br />72,00o allowance per ACA <br />~~2,000 <br />500 <br />5500 <br />E72,500 _ ----- 0.47 - - <br />Building Shell & Core Detail Estimate - Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.