__ __ _.._
<br />Courthouse Square
<br />Court & High Street
<br />Salem, Oregon
<br />Arbuckle Costic Architects, Inc
<br />50°~ Contract Documents Estimate
<br />_ ___ __ - -
<br />Ground Level
<br />Second Floor
<br />Third Floor
<br />Fourth Floor
<br />Fifth Floor
<br />Penthouse
<br />Totat Gross Aroa
<br />Building Shell & Core _ _ _
<br />- - -- ------
<br />__ FURNISHINGS _ _ _______ _ _
<br />Window treatment
<br />@ relites & sidelites 336 sf
<br />windows 11,754 sf
<br />curtain wall 3,038 sf
<br />Subtotal
<br />Floor Mats & Frames
<br />Walk-off mat 88 sf
<br />Subtotal
<br />- - - - _ _ _-- _ - ----
<br />Estimate Date: R 03-Dec-9 .
<br />Document Date: 29-Oct-98
<br />Print Date: 03-Deo-98
<br />Print Time: 11:07 AM
<br />Construction StaR: Spring_99
<br />,~, Comments_ __
<br />2.85
<br />2.85
<br />2.85
<br />28.00 958
<br />33,499
<br />8,658
<br />2,464
<br />
<br />
<br />
<br />0.00 0
<br />~ _ _ _TOTAL - FURNISHINGS
<br />SPECIAL CONSTRUCTION
<br />Item sf
<br />Subtotal
<br />- ----
<br />TOTAL - SPECIAL CONSTRUCTION
<br />CONVEYING SYSTEMS
<br />958
<br />33,499
<br />8,658
<br />5 EO So So So Sa3,~~5
<br />2,464I ~OI 30 3o ao
<br />5,579 3o EO ~0 30
<br />0
<br />o so so ao so so
<br />only
<br />0.30
<br />0.00
<br />Pssngr elevator 3000# geared - 350 fpm 15 stop 20,500.00 307,500
<br />Cab finishes 3 ea 6,000.00 18,000
<br />premium for extended cab ht. 1 sum 1,800.00 1,800
<br />Subtotal 327,300
<br />_TOTAL__CONVEYING SYSTEMS ___ 5327,300
<br />MECHANICAL
<br />HVAC
<br />subcontractor quote
<br />controls
<br />subcontractor oh & p
<br />Subtotal
<br />2.14
<br /> 152,792 sf 9.62 1,469,565 ~,469,565
<br /> 152,792 sf 1.57 240,000 2ao,0oo allowance per Trane
<br /> 15% of 1,709,565 256,435 25s,435
<br /> 1,966,000 0 0 0 0 ~,sss,ooo 12.87
<br />-- -- ---- - _ _ - ----------- -- - -
<br />Architectural Cost Consultants, LLC
<br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA
<br />6441 SW Canyon CouR, Suite 103
<br />Portland, Oregon 97221
<br />Phone (503) 297-7210 Fax 503) 297-7187 ___
<br />------ -- -- - -
<br />__ ---- ---- --
<br />23,249
<br />37,537
<br />32,086
<br />32,088
<br />32,012
<br />1,818
<br />---- - --- 152.792 sf -- --
<br />~rnt CosWnit Cost ___ Totai
<br />307,500
<br />18,000
<br />1,800
<br />ao ao ao ao aaz~,soo
<br />Building Shell & Core Detail Estimate - Page 16 ,;
<br />
|