My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Cost Sharing Models
>
CS_Courthouse Square
>
Cost Sharing Models
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:02:22 AM
Creation date
8/9/2011 10:07:20 AM
Metadata
Fields
Template:
Building
RecordID
10080
Title
Cost Sharing Models
Company
WEGroup Report 1993
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Design - Planning
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
----- ------- ------ - _ - - -- - <br />_ . _ . - --- --- __ _ _ - - ---- <br />-- ------- - - --------- - <br />Courthouse Square Architectural Cost Consultants, LLC Estimate Date: R 03-Dec-9 <br />Court & High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 29-Oct-98 <br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 03-Dec-98 <br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 Print Time: 11:07 AM <br />50% Contract Documents Estimate ____ __ _____ _____ Phone (503) 297-7210 Fax (503) 297-7187 Construction Start: Spring 99_ <br />_ - _--- - --- ---- <br />--- -- -- _ - ------- -- <br />Third Floor --- - _-- 28.082 <br />Total Area 28,062 ~ sf sf <br />--- -- - - <br />-- -- - - -- <br />- --- ----- <br />-------_ -__ _ omm <br />Third Floor Tenant Finishes Quantity_ _ Unit CosUUnit Cost Total ___ __ _ __- _____ __ <br />--- -- <br />-- - --- - --- ___------ <br />METALS - -- ------ ------ -- --- <br />Miscelianeous metals <br />miscellaneous 28,062 sf 0.05 1,403 1,403 0 <br />Subtotal 1,403 1,403 0 <br />TOTAL- METALS 51,403 $1,403 $0 ___ 0.05 __ ____ <br />vvvt~u a~ rur~ i i~.~ <br />Rough carpentry <br />& backing <br />s blockin <br />ll <br />i <br /> <br />1,403 <br />062 sf 0.05 <br />28 <br /> <br />1,403 <br /> <br />~ -- <br />g <br />aneou <br />sce <br />m <br />Subtotal ___ <br />, <br />1,403 1,403 0 <br />Finish carpentry <br />il <br />h <br />i <br />4,656 <br />582 If 8.00 <br />4,656 <br />0 <br />r ra <br />a <br />c <br />Subtotal __ _ <br />4,656 4,656 0 <br /> plastic laminate <br />Casework <br />break room 3220 <br />base cabinet <br />5.5 If 165.00 908 <br />908 <br />0 <br />counter 3.0 If 90.00 270 270 0 <br />wall cabinet 5.5 If 85.00 468 468 0 <br />wall shelves 2.5 If 45.00 113 113 0 <br />wait / reception 3120 <br />200 <br />00 2 <br />0 If 275 <br />8 <br />2,200 <br />0 <br />counter , <br />. <br />. <br />work / copy / file 3123 <br />base cabinet <br />14.0 If 165.00 2,310 <br />2,310 <br />0 <br />wall cabinet 14.0 If 85.00 1,190 1,190 0 <br />victim assistance 3212 <br />base cabinet <br />11.5 If 165.00 1,898 <br />1,898 <br />0 <br />copy 3227 <br />base cabinet <br />3.0 If 165.00 495 <br />495 <br />0 <br />base cabinet shelves 4.5 If 125.00 563 563 0 <br />0 <br />~ wall cabinet 14.0 If 85.00 1,190 1,190 <br />Third Floor Tenant Improvements Detail Estimate - Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.