My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Cost Sharing Models
>
CS_Courthouse Square
>
Cost Sharing Models
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:02:22 AM
Creation date
8/9/2011 10:07:20 AM
Metadata
Fields
Template:
Building
RecordID
10080
Title
Cost Sharing Models
Company
WEGroup Report 1993
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Design - Planning
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
__ _ . -- ----_ _ _--- - _ __ _ _ _ <br />Courthouse Square <br />Court 8~ High Street <br />Salem, Oregon <br />Arbuckle Costic Architects, Inc <br />50% Contract Documents Estimate <br />- _ __ _---- -- ----- -------_ _ _ <br />Third Floor <br />Total Area <br />Third Floor Tenant Finishes <br />Qua <br />-- -- ----- - -- ---- - ------------ ----- ._ _ .. -- -- . <br />Architectural Cost Consultants, LLC Estimate Date: R 03-Deo-9 <br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 29-Od-98 <br />6441 SW Canyon Court, Suite 103 Print Date: 03-Dea98 <br />Portland, Oregon 97221 Print Time: 11:07 AM <br />___ _ Phone (503) 297-7210 Fax (503) 297-7187 ___ Construction Start: _Spring 99 <br />--- <br />----- <br />-- ----- ------ <br />- -- . _ -- - <br />28,062 <br />28,062 sf sf <br />nit CosUUnit Cost Total Comments <br />WOOD 8~ PLASTICS - Continued <br />Casework - Continued <br />support enforcement 3228 <br />base cabinet 4.0 If 165.00 660 660 0 <br />wail cabinet 4.0 If 85.00 340 340 0 <br />wait / reception 3231 <br />counter 7.0 If 275.00 1,925 1,925 0 <br />wait / reception 3281 <br />counter 23.0 If 275.00 6,325 6,325 0 <br />workroom 3281 <br />base cabinet 17.0 If 165.00 2,805 2,805 0 <br />counter 16.0 If 90.00 1,440 1,440 0 <br />wall cabinet 17.0 If 85.00 1,445 1,445 0 <br />' waiting 3237 <br />through-wall counter 9.0 If 275.00 2,475 2,475 0 <br />Subtotal <br />- <br />~ 29,018 <br />-- --------- -- 29,018 0 1.03 <br />~_ TOTAL - WOOD & PLASTICS _ S35 077 <br />---- - - --- --------- ~ $35,077 $0 _ 1.25 I <br />MOISTURE - THERMAL CONTROL --- --- ---- <br />Firesafing <br />allowance 28,062 sf 0.02 500 500 0 <br />Subtotal 500 500 0 <br />Caulking 8~ Sealants <br />caulking / sealants 28,062 sf 0.07 1,964 1,964 0 <br />Subtotal 1,964 1,964 0 <br />_ --- <br />- -- __ _ -- -- <br />TOTAL - MOISTURE THERMAL CONTROL <br />- -- ---- ------ -- --- - ----- --- 52,464_ $2,464 $0 0.09 <br />Third Floor Tenant Improvements Detail Estimate - Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.