-- ____ . _ __ ._ _ --- - _ __. . __ _ _- - - -------- ------ -_ -- - - ----- -
<br />Courthouse Square Architectural Cost Consultants, LLC Estimate Date: R 03-Dec-9
<br />Court & High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 29-Oct-98
<br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 03-Dec-98 .
<br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 Print Time: 11:07 AM
<br />50% Contract Documents Estimate__ _ _ _ _ __ __ ___ _ _. _____ ._______ _Phone (503) 297-7210 Fax (503) 297-7187 Construction Start:_ Spring 99
<br />_--- -- -- - - - - -- --------- - - ~__. _ _ _ _ - - ---- i
<br />ThiM Floor - 28.062
<br />Total Area 28,062 sf sf ~
<br />-- - - - - --- - - -- - - - ---- --
<br />Third Floor Tenant Finishes _ __ Quant~_ Unit _ CosUUnit Cost __ Total Comments
<br />
<br />----
<br />DOORS, WINDOWS & GLASS
<br />---- - ---
<br />Doors, Frames & Hardware (incls. installatio )
<br />interior doors
<br />pe A WD
<br />t 76 ea 775.00 58,900 58,900 0
<br />y
<br />Subtotal 58,900 58,900 0
<br />Relites, Sidelites & Transoms
<br />conference 3121 38 sf 28.50 1,083 1,083 0
<br />conference 3146 28 sf 28.50 798 798 0
<br />conference 3209 28 sf 28.50 798 798 0
<br />conference 3282 32 sf 28.50 912 912 0
<br />reception 3261 116 sf 28.50 3,306 3,306 0
<br />Subtotal 6,897 6,897 0
<br />TOTAL - DOORS, WINDOWS & GLASS ~65,797 $65,797 $0 ___ 2.34 _
<br />_ _ ~
<br />FINISHES
<br />____
<br />Partitions !
<br />typical partitions 20,016 sf 3.45 69,055 69,055 0
<br />full ht partitions 863 sf 4.30 3,712 3,712 0
<br />furr columns 2,556 sf 3.50 8,946 8,946 0
<br />acoustic @ above 10,008 sf 0.65 6,505 6,505 0 verify
<br />furring @ concrete wall 765 sf 2.25 1,721 1,721 0
<br />Subtotal 89,940 89,940 0
<br />Ceilings
<br />install ceiling grid & tiles 15,697
<br />27,064 sf 0.58 15,697 0
<br />Subtotal __
<br />15,697 15,697 0
<br />Resilient ~
<br />vct 789 sf 1.75 1,381 1,381 0
<br />rubber base 5,357 If 1.50 8,036 8,036 0
<br />I Subtotal 9,416 9,416 0
<br />Third Floor Tenant Improvements Detail Estimate - Page 3
<br />
|