My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction: Pre-Construction Remedial
>
CS_Courthouse Square
>
Construction: Pre-Construction Remedial
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:22:23 PM
Creation date
8/9/2011 3:34:50 PM
Metadata
Fields
Template:
Building
RecordID
10105
Title
Construction: Pre-Construction Remedial
Company
Marion County
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Bruce Scherzinger <br />August 25, 1997 <br />Page 4 <br />at 50-foot intervals and analyzed for TPH-HCID. <br />If PCS or USTs are encountered during construction excavation, it will be investigated and <br />remediated in the same manner as described previously. <br />The building construction financing requires a DEQ-approved work plan to address <br />environmental issues on the site. Therefore, your prompt review and written response would be <br />appreciated to maintain the project construction schedule. <br />Thank you for the review of this Work Plan. <br />questions. <br />Please call me at (503) 231-6078 if you have any <br />Sincerely, <br />Thomas B. Gainer, P.E. <br />Senior Environmental Engineer <br />Attachments: Table 1 <br />Figures 1 and 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.