Laserfiche WebLink
Mr. Bruce Scherzinger <br />August 25, 1997 <br />Page 4 <br />at 50-foot intervals and analyzed for TPH-HCID. <br />If PCS or USTs are encountered during construction excavation, it will be investigated and <br />remediated in the same manner as described previously. <br />The building construction financing requires a DEQ-approved work plan to address <br />environmental issues on the site. Therefore, your prompt review and written response would be <br />appreciated to maintain the project construction schedule. <br />Thank you for the review of this Work Plan. <br />questions. <br />Please call me at (503) 231-6078 if you have any <br />Sincerely, <br />Thomas B. Gainer, P.E. <br />Senior Environmental Engineer <br />Attachments: Table 1 <br />Figures 1 and 2 <br />