My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Demolition/Abatement Constracts (Folders 1-2)
>
CS_Courthouse Square
>
Demolition/Abatement Constracts (Folders 1-2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:19:28 PM
Creation date
8/10/2011 10:26:15 AM
Metadata
Fields
Template:
Building
RecordID
10111
Title
Demolition/Abatement Constracts (Folders 1-2)
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
('OMMONLY ASKED QUESTIONS <br />1) What are "prevailing wage rates~" <br />A prevailing wage rate is the minimum wage, including fringe benefits, to be paid workers employed on <br />contracts for public works. Different rates are established for specific trades and specific geographical <br />areas. <br />2) Who must be paid "~revailin~wage rates~" <br />All employees of a contractor or subcontractor engaged on a public works project when the total price of <br />the project is 525,000 or more must receive at least the prevailing wage rate (PWR) for time worked on the <br />project, unless otherwise exempt. <br />Office/clerical employees and supervisory employees who are supervisory only and do not perform any <br />hands-on labor are not required to be paid the PWR. A person who owns an operates his/her own truck on <br />construction projects (Owner/Operator) is not required to be paid the PWR. This does not include <br />owner-operators of any other type of equipment such as bulldozer, scrapers, backhoes, cranes, drilling rigs, <br />or welding machines. <br />3) What about contracts when Federal funds are used~ <br />When more than 52,000 of federal funds are involved, the contract is usuallv subject to the provisions of <br />the federal Davis-Bacon Act, not Oregon PWR statutes. (Further information may be obtained from the U.S. <br />Department of Labor, Wage and Hour Division, Portland, Oregon (503-326-3057).) In the event that federal <br />funds are involved, but the contract is not regulated under the Davis-Bacon Act, Oregon's prevailing wage <br />rate statutes may apply (ORS 279.348 - 279.380). Orggon statutes pertainina to overtime reauirements <br />~~1~ ^n both state and federal~ regulated contracts IORS 279.3341. <br />4) I don't have a p~nsion fund How do I calculate frin4e benefits~ <br />Workers must receive at a minimum the sum of the basic hourly rate plus all fringe benefits for each hour <br />worked on a public works contract. Fringe benefits may be paid either to a third party trust account or in <br />cash directly to the worker. <br />51 Mv em}~lovees receive health benefits Do I get credit for the health benefit when I ~reoare mv aavroll on a <br />~2ublic works ~roject~ <br />Yes. Anv expenditures an employer makes for bona fide employee benefits can be charged against the <br />fringe benefit payments designated in the prevailing wage rate booklet. To learn how to compute the <br />correct hourly charge, call the Wage and Hour Division (503-731-40741. <br />6) What if the emplo~ees are not paid on an hourly basis~ <br />All workers must receive at least the basic hourly rate of wage and fringe benefits for each hour worked on <br />the project. If an employee is paid other than on an hourly basis, the equivalent hourly rate (for both wages <br />and fringe benefits) must still be at least equal to the rates published. <br />7) How do I classif~workers~ <br />Virtually all of the job classifications/trades normally used in the non-residential construction industry are <br />represented by the job classifications used in this PWR publication. These classification titles should be <br />used according to common practice. If you need residential construction rates, or if you have questions <br />about how to classify workers, contact the Prevailing Wage Rate Coordinator at 15031-731 -4074. <br />Laborers who do basic work requiring no specific skills, training, or knowledge are generally classified as <br />Group 1 Laborers. (Note that Landscapers are classified as Laborers, and Ornamental Ironworkers are <br />classified as Ironworkers.) <br />JANUARY 1, 1997 PAGE 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.