My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Demolition/Abatement Constracts (Folders 1-2)
>
CS_Courthouse Square
>
Demolition/Abatement Constracts (Folders 1-2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:19:28 PM
Creation date
8/10/2011 10:26:15 AM
Metadata
Fields
Template:
Building
RecordID
10111
Title
Demolition/Abatement Constracts (Folders 1-2)
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COMMONLY ASKED QUESTIONS (Continued) <br />8) 1~Lhen are new rates determined? How long are y effective~ <br />Prevailing wage rates are cletermined once each year by the Commissioner of the Bureau of Labor and <br />Industries. The Commissioner may amend the rates at any time. The rates are usually amended at least <br />once each year. The rates in effect at the time the bid specifications are first advertised are those that <br />apply for the duration of the contract, with one exception. If during the bidding process the prevailing wage <br />rate changes, the public contracting agency (not the contractor) has the option of amending the bid <br />specifications to reflect such changes. <br />91 How do I~~revailing wage rates? <br />Every contractor or subcor~tractor employing workers on a public works project is required to post the <br />applicable prevailing wage rates in a conspicuous and accessible place in or about the work-site. Rates need <br />to be posted for the duratian of the job. Contractors and subcontractors who intentionally fail to post the <br />PWR can be made ineligible to receive any public works contract for up to three years. <br />10) What can I do about a contractor who is not com~lving with Oregon's PWR law? <br />File a compiaint with the nearest office of the Oregon Bureau of Labor and Industries (see list of offices on <br />page 1), or contact the Wage and Hour Division, Bureau of Labor and Industries, 800 NE Oregon St. ti 32, <br />Portland, Oregon 97232 (5C~3-731-4074-. You may also complain to the contracting agency, which has the <br />contractual authority to pay PWR claims directly to a contractor's or subcontractor's workers (ORS <br />279.314). <br />1 1) What haQ~ens to contractors who do not com~ly with PWR statutes? <br />Contractors and subcontractors who pay less than the prevailing wage rates may be liable to the workers <br />affected for the amount found due plus an equal amount as liquidated damages (ORS 279.356-. Also, the <br />law now provides for a civil penalty of up to 55,000 for any violations of the prevailing wage rate laws, <br />including ORS 279.348 to 279.380 and the prevailing wage rate administrative rules pursuant to those <br />statutes. Contracting agencies have the contractual authority to withhold payments due or to be due to the <br />contractor or subcontractor in order to pay the unpaid prevailing wages directly to the worker (ORS <br />279.314). <br />Contractors and subcontractors who intentionally refuse to pay the prevailing wage rate to workers <br />employed on public works or to post the PWR on the job site may be determined to be ineligible to receive <br />any public works contracts for a period of up to three years (ORS 279.3611. Workers employed by the <br />contractor or subcontractors have a right of action against the surety of the prime contractor for any unpaid <br />prevai~ing wages. <br />A list is kept of all contractors, subcontractors, and other persons ine~igible to receive public works <br />contracts and subcontracts. When a contractor or subcontractor is a corporation, the individual officers and <br />agents of the corporation can be debarred in addition to the corporation. As a result, individuals who <br />intentionally fail to pay or post the PWR are prevented from simply moving from one corporation to another. <br />In addition, ORS 279.073, provides that any person that loses a competitive bid for a construction contract <br />may bring an action for darnages against the person who is awarded the contract, if the losing bidder can <br />establish that the winner has knowingly violated any one of several laws, including the requirement to pay <br />prevailing wage rates while performing work under the contract. The losing bidder is entitled to recover, as <br />liquidated damages, 10% of the losing bid amount, or $5,000, whichever is greater, plus reasonable <br />attorney fees. <br />12) How much do I av aR rR,._entices? <br />To qualify as an apprentice, the worker must be registered in a bona fide apprenticeship program of the U.S. <br />Department of Labor, Bureau of Apprenticeship and Training (BAT) or with any State Apprenticeship Agency <br />recognized by BAT. For information call (5031 731-4072. The apprentice is to receive ~J_( fringe benefits <br />and a percentage of the journeyman's wage rate listed in this booklet. This rate may be different than the <br />rate contained in the Apprenticeship Standards for the trade. The correct percentage shall be determined by <br />the appropriate apprenticeship committee. All other workers receive rates as published. <br />JANUARY 1, 1997 PAGE 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.