My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Facilities- Misc. Documents
>
CS_Courthouse Square
>
Facilities- Misc. Documents
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:02:57 AM
Creation date
8/15/2011 11:04:31 AM
Metadata
Fields
Template:
Building
RecordID
10132
Title
Facilities- Misc. Documents
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Design - Planning
Project ID
CS9601 Courthouse Square Research
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
`~~~ <br />.ill 1~~~111~~~~~ <br />~~~`..~`, <br />Marion CountiJ <br />OREGON <br />Facilities Management <br />December 27, 1995 <br />MEMORANDUM <br />FACILITIES MANAGER <br />Bob McCune <br />(503) 588-5154 TO: Randy Curtis, Director <br />BOARD OF General Serv'c S <br />COMMISSIONERS <br />Randall Franke <br />Gary Heer FROM: Bob McCune, Manager <br />Mary Pearmine Facilities Manager <br />ADMINISTRATIVE <br />OfFICER <br />Ken Roudybush SUBJECT: Site Demolition Costs for Courthouse Square Block <br />The following are the estimated costs for demolition of the buildings present- <br />ly located on the block proposed for the Courthouse Square. Asbestos <br />Abatement cost estimates have been broken out and included in the total <br />but the total DOES NOT INCLUDE the cost of mitigation of any other <br />hazardous wastes that may be found on the site. The cost of mitigation for <br />the Chevron Lot soil contamination is outlined in a separate memo. <br />DEMOLITION COSTS (without hazardous waste mitigation) <br />Senator Building $1,639,735 <br />Beri, Dentist, Beanery, Liquor and Wine Buildings $72,052 <br />Community Development Center $82,425 <br />5 Percent Contingency $89,711 <br />TOTAL DEMOLITION EXPENSE $1,833,923 <br />ASBESTOS ABATEMENT COSTS <br />Community Development Center Ceilings <br />Piping <br />Floor Tile <br />Senator Building Ceilings <br />Piping <br />Floor Tile <br />10 Percent Contingency <br />TOTAL ASBESTOS ABATEMENT EXPENSE <br />GRAND TOTAL BLOCK DEMOLITION EXPENSE <br />$48,000 <br />$5,000 <br />$20,000 <br />$61,800 <br />$70,000 <br />$20,000 <br />$22,480 <br />$247,280 <br />$2,081,203 <br />Marion County Courthouse • 100 High Street NE • Salem, Oregon 97301-3670 <br />
The URL can be used to link to this page
Your browser does not support the video tag.