Laserfiche WebLink
FirstWorld Communications <br />~ <br />~ ~ <br />FIRSTWORLDi~ <br />COMMUNICATIONS <br />FiistWorld Communications Work prder# <br />SERVICE ESTIMA7E <br />Custome~ Name Marion County Customer Contact <br />oate: January 25, 1999 <br />Service Order Prepared By: <br />NCG <br />John McDowell <br />503-373~430 <br />Salem <br />Customer Phone 503~373~488 Extension Fax <br />Customer Address: 100 High St. City <br />State Or ZIP <br />D~partment <br />SECOndary Contact <br />Small Job Quota ^ <br />Trouble Ticket ^ <br />Building Name <br />Quot~ Built From Standand Materials List <br />( 24 to 48 hr. potential lead time required ) <br />D <br />^ <br />99-a546 Customer WoNc Order # <br />T&M <br />Change Order <br />a <br />New Court House <br />Budgetary Quote Q <br />Walk 7hrough Notes ^ <br />Quote Built From Non Standard Materials List ~ <br />{Material availability to be researched) <br />SCOPE OF WORK <br />FirstWorld Communications will provide and install Coppe~ and Fiber Optlc cabling between the existing Courthouse MDF and <br />the 5th floor Computer Room in the new building. Material and Labor will include the following: <br />1) Install one each 400 pair and 100 pair gel filled cable in a customer pro~ided 4" conduit. <br />2) The cabkes will be teRninated on (5} 100 pair 110/110 protector blocks ,provided by FiistWorld, at the computer room and <br />+NIII be tenninated on (5) 66B/66B protector blocks at the MDF in the Courthouse. <br />3) 1000 Gas Tube modules will E~e provided to populate the pmtector blocks. <br />4) At the 100 NE High St. focation, FirstWorld will extend the 500 pairs from the protector blocks to the MDF via 5 each <br />100 pair PVC cab(es and tarminate them on new 66 blocks. <br />5) One 6 MM Fiber lndoodOutdoor Riser cable will be placed in conjunction with the cop er cables. Tha fibsr optic cabl~ <br />wiil be placed in appropria#e innerduct. <br />6) The fiber cable will be terminated in a new 24 pott wall mount fiber distribution unit at the MDF and a 24 port rack mount <br />unit at the Computer Room. MM "ST' Conneetors will be utilized. <br />7) The existing 6 fiber cable will be rerouted and reterminated on the F.D.U. at the Courthouse MDF. <br />8) The copper cable will be testEd for opens, rolls and shorts; The fber wiN be tested at 850 nm according to EIARIA 455. <br />a) Hard copy documantation ef the test resufts will be fumished. <br />NOTE: This quotation is budgetary in nature only. A walkthrough to determine actual footages and a firm <br />quotation will he generated whan the building is in place. <br />~stomer Requested Dates: Star~ Complete <br />1/25/99 Scope Of Work 99-a546 Page 1 <br />6iz ' d 99L ' ON NO~IN3 Wti6b : 8 666 ~' 9z ' Ntit <br />Floor <br />Phone <br />