My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Facilities- Misc. Documents
>
CS_Courthouse Square
>
Facilities- Misc. Documents
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:02:57 AM
Creation date
8/15/2011 11:04:31 AM
Metadata
Fields
Template:
Building
RecordID
10132
Title
Facilities- Misc. Documents
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Design - Planning
Project ID
CS9601 Courthouse Square Research
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FirstWorld Communications <br />~ <br />~ Date: January 25, 1999 <br />~ I RST1N0 R LD'M FirstWorld Comnnunications Terms and Conditions <br />COMMUNICATIONS <br />FirstWortd Communications Work Order # 99-a546 <br />1. FirstiNorld Communications will implerTtent this installation in accordance with the National ~lectrical Code, State and Local <br />mandates and within EIA / TIA telecommunications installation standards. <br />2. FirstWorld Cammunications will warranty this project for one year irom the date of project acceptance for materials and labor <br />unless othe~wise noted in the scope of work <br />3. FirstWorld Communications assum~s that this work may be performed during normal business hours unless noted otherwise in <br />the scope of work. <br />4. FirstWorld Communications assumes that no asbestos will be encountered during this installation. This quotation does not <br />in~lude removal or abatement of any asbestos or asbestos contaminated m~terials. <br />5. FirstWorld Communications assumes that all cables wiil be placed above a typical drop ceiling with removable lay-ln tiles unless <br />noted otherwise ih tha scope of wark. <br />6. FirstWorld Communications assumes that conditions affacting this work have not changed since the time of our site visitafion. <br />7. FirttWorld Communications assumes that any conduits cr raceways schadulecf for re use durin$ the site walkthrough are of <br />sufficient cepacity for the proposed cables and are not damaged or blocked in any way. <br />8. FirstWorld Communications assumes that sufFcierit rack space and power are available for the listed equipment. <br />9. FirstWolid Communications assumes that there will be unimpeded access to ~II necessary work areas for the duration of the <br />project. <br />11. The customer will provide a clean and safe ernironment for the du~^ation of this praject. Where applicable, the custamer wil! <br />inform FirstWorld Communications representatNes of any hazardous woiicing conditions and provide appropriate training and <br />precautions <br />12• This quote is ~alid for thirty (30) days from the date shown. FirstWorld Communications reserves the right to adjust this <br />quotation for any phases of this projeet that are scheduled for completion beyond sixty (60) days from tha date shown below. <br />Project Specific Addidonal Assumptions: This quote is budgetary only. <br />FirstWoMd assumes that a formaf walkthrough will bo performed when the building is in place. At that tirne a formal <br />quotation will be submitted which will reflect actual footages and conditions. <br />Acceptanee of Terms and Conditions : <br />Walk tha Guabmer through the above tarms and make modrfications or additions as nesdsd. Have Me Customer Inkfalke below aQreetng that tAe fe-ms es written <br />a as modllled are acceptable, <br />Customer Signature <br />1125/98 <br />Terms and Condftions <br />Date <br />99-a5~6 <br />Firstworld Initials <br />Page 1 <br />6iE ' d 99L ' ON N021N3 WtiOS : 8 666 S' 9z ' Ntit <br />
The URL can be used to link to this page
Your browser does not support the video tag.