Laserfiche WebLink
FirstWorld Communications <br />~ <br />~ <br />FIRSTWORLD'M <br />COMMUNICAT10N5 <br />~ate: January 25, 1999 <br />Service Order Prepared By: <br />NCG <br />~irstWorld Communicatians Woric Order# <br />SERVICE ESTIMATE <br />99-a546opt.1 Customer Work Order #~ <br />Customer Name Marion County Customer Contact John McDowell <br />Customer Phone 503-373-4488 Extension Fax <br />CustomerAddress: 100 High St. C~- <br />State Or ZIP Buiiding Name <br />5Q3-373-4430 <br />Salem <br />New Court House <br />Depattment Floor <br />Secondary Contact Phone <br />Small Job Quote ^ T8M <br />Troubie Ticket ^ Change Order <br />Quote Built From Standard Materials List 0 <br />( 2d to 48 hr. potendal lead Y~me required ) <br />^ <br />^ <br />Budgetary Quote 0 <br />Walk Through Notes ^ <br />Quote Built From Non Standard Materials List ~ <br />(Materiat availabilily ta be researched) <br />SCOPE OF WORK <br />FirstWorld Communications will provide and install Copper and Fiber Optic cabling between the existing Courthouse MDF and <br />the 5th floor Compute~ Room in the new building. Material srtd Labor wilt include the following: <br />1) Install one esch a04 pair and 100 pair gel filied cable in a customer provided 4" conduit. <br />2) The cablos will be terminated on (5) 100 pair 110/110 protector blocks ,provided by FirstWorld, at the computer room and <br />wil} be terminated on (5) 6fiB/666 protector blodcs at the MDF in the Courthouse. <br />3)1000 Gas Tuba modufes will be provided to populate the pmtector blocks. <br />4) At the 100 NE High St. location, FirstWorld will eactend the 500 pairs firom the protector blocks to the MDF ~ia 5 each <br />100 pair PVC cables and terminate them on new 66 blocks. <br />5) One 12 MM Fiber IndoodOutdoor Riser cable will bg placed in conjunction with the 5U0 pai~ copper cable. The fiber optic cable <br />will be placed in appropriate innerduct. <br />6) The fiber cable wilf be terminated in a new 24 port wall mount fiber distribution unit at the MDF and a 24 port rack meunt <br />unit at the Computer Room. MM "ST' connectors will be utilized. <br />7) The copper cable will ba tested for opens, rolis and shoRs; The fiber will be tested at 850 nrn according to ~IA/TIA 455. <br />a) Hard copy documentation of the test results will be furnished, <br />NOT~: This quotation is bud9etary in nature on[y. A walkthrough to determine actual footagas and a firm <br />quotation wili be generated when the buiiding is in place. <br />Customer Requested Dates: Start Complete <br />~/2~gg Scope Of Wo~ic 99-a546opt1 Page 1 <br />6/9'd 99L'ON NOaN3 WtitiS:B 666ti'9z'Ntlr <br />