My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Facilities- Misc. Documents
>
CS_Courthouse Square
>
Facilities- Misc. Documents
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:02:57 AM
Creation date
8/15/2011 11:04:31 AM
Metadata
Fields
Template:
Building
RecordID
10132
Title
Facilities- Misc. Documents
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Design - Planning
Project ID
CS9601 Courthouse Square Research
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FirstWorid CommunicaHons <br />~ <br />, ~ Da~e: January 25, 1999 <br />F I RSTWO R LDTM FirstWorid Communications Terms and Conditions <br />COMMUNICAT1oN5 <br />FirstWO~ld Cammunications Work Order # 99-a546opt.1 <br />1. FirstWorld Communications will implement this installation in axordance with the National Electricat Cade, State and Locat <br />mandates and within EIA / TIA telecommunications installation standards. <br />2. FirstWorld Communications w'tll warranty this praject for one year from the date of project accaptance for materials and labor <br />unless otherwise noted in the scope of work <br />3. FirstWorld Cammunications assumes that this work may be perfarmed during normal business hours unless noted otherwise in <br />the scope of work_ <br />4_ FirstWorld Communications assumes that no asbestos will be encountered during this installation. 7his quotation does not <br />include remo~al cr abatament of any asbestos or asbestos contaminated materials. <br />5. FirstWorld Communications assumes that all cables will be placed above a typical drop ceiling with removable lay-in tiies unless <br />noted otherwise in the scope of work. <br />6. FirstWorld Communicadons assumes that candi~ons affecting this work have not changed since the time of our site ~isitation. <br />7. FirstWorld Communications assumes that any conduits or raceways scheduled for ~e use during the site walkthrough are of <br />sufficierit capacity for the proposed cables and are not damaged or blocked in any way. <br />8. FirstWorld Communieations assumes that sufficient rack space and power are available for the listed equipment. <br />9. FirstWorld Communications assumes that there will be unimpeded access to all necessary work arees for the duration of the <br />project. <br />11. The customer will provide a clean and safe environment for the duration of this project. Where applicable, the customer will <br />inform FirstWorld Communicatiohs representatives of any hazardous working conditions and provide eppropHate training and <br />precautions <br />12• This quote is valid for thirty (30) days from the date shown. FirstWorld Communications reserves the right to adjust this <br />quo4tian for ahy phases af this project that are scheduled for completion beyond sixty (60) days from the date shown below. <br />Project Specific Add~tional Assumptians: This quote is budgetary only. <br />FIBtWorld assumes that a forms~t walkthrough will be perfoRned when the building is in place. At that time a formal <br />quotation will be submitted which witl reflect actual footages and conditions. <br />Aceeptance of Terms and Conditions : <br />I~ralk the f:ustamer thmugh the above te-ms anQ make modifica6ons a sdditions as neaded. Have the Custom~r InRfaflzs bBlow agreeing thdt the harms es w-iften <br />or as modifred ere ac~eptabl~. <br />C~stomer Signature <br />1125/99 <br />Date <br />TermS and Canditions <br />99-a546opt1 <br />FirstWorld Initials <br />Page 1 <br />6iL ' d 99L ' ON NO~IN3 Wti ti S: 8 666 Z' 9z ' Ntir <br />
The URL can be used to link to this page
Your browser does not support the video tag.