My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LEED- Miscellaneous
>
CS_Courthouse Square
>
LEED- Miscellaneous
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:28:41 AM
Creation date
8/15/2011 2:31:18 PM
Metadata
Fields
Template:
Building
RecordID
10247
Title
LEED- Miscellaneous
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Energy
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
oints ontact erson <br />Credit Description Possible Documents Required Namelnumber <br /> 1. Copy of the measurement and verification <br /> plan. 2. Signed letter of certification by the <br /> commissioning engineer or the respective Greg Katz; Bob <br /> Comply with the Departroent of Energy's Intemational design engineer confirming that the design McCune; EESI' <br />Bonus Credit Measurement and Performance, Measurement and Verification Protocol intent has been achieved (letter shall be on commissioning agent is <br />Verification (IPMVP) for energy consumption 1 companyJetterhead): Fred Shaub. <br />Conserving Materials and Resources <br /> Signed certification stating that CFC and <br /> CFC refrigerants and halon fi~e suppression systems are not halon containing equipment is not used in <br />Prerequisite 1 Eliminate CFCs permitted 0 the building. Oliver Raab, fnterface. <br />' Provide stamped as-buiit drawing(s)' <br /> Provide a centralized ground-floor location for collection and showing ground floor location for collection <br /> storage of materiais separated for recycling, including and storage of materials separated for <br />Prerequisite 2 Storage and collection newspaper, glass, metals, plastics, organic waste (food and recycling. Note locations and sizes of Leonard Lodder; Jim <br />of recycfables soiled pape~j, and dry waste 0 collection and storage bins highlighted. Sears. <br /> 1, Contractors are to provide highlighted- <br /> specifications, noting advanced practices. <br /> Develop a construction and demolition waste management 2. ConUactors to submit a copy of their <br /> plan that identifies licensed haulers of recyclables; Waste Management Plan, noting advanced ` <br /> documents cost for recycling and frequency of pickups; practices. 3. Report on end of p~oject <br /> mandates recycling of cardboard, metals, concrete, bricks, results for recycling (materials, tons <br /> asphalt, land cleanng debris, beverage containers, clean recycled, cost for recycling, savings) and Bonnie McCullough <br /> dimensional wood, plastic, glass, gypsum board and carpet; landfilling, provide recyclingrate. 4. cost (Marion County) and <br />Construction waste management- and evaluates the cost~ffectiveness of recycling rigid foam effectiveness calculations (if necessary to John Gremmels (Pence <br />level 2 insulation, engineered wood products, and other materials 2 show why some materials weren't recycled). Kelly) <br />11/2/00 8:07 AM Page 4 leed matrix 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.