Laserfiche WebLink
Points ontact Person <br />Credit Description Possible Documents Required Namelnumber <br /> 1. Compilation of submittals for Local <br /> Materials#hat includes material, <br /> manufacturer, location of manufacturing <br /> facility, distance in miles from project site, <br /> and cost for materials: 2. Project contractor <br /> must provide asummary of all Local <br /> Materials supplied to project, the cost for <br /> these materials, the total material cost for <br /> Minimum of 20% of building materials manufactured within the project, and calculations that show that <br />Use of local materials 300 air miles of the building site 1 the percentage requirement is met. John Gremmels. <br /> In building of four or more stories, install a mechanical <br /> system that allows for'floor to floor transportation and so~ting <br /> of newspaper, glass, metal, plastics, organic waste (food <br /> and soiled paper), and dry waste for recycling (or disposal ) <br /> in separate containers in the ground floor of the building Plan descnbing the building-wide recycling Jim Sears/Bonnie <br />Occupant Recyc{ing other than by labor 1 approach. McCullough <br />Enhancing Indoor Environmental <br />Quality <br /> Signed certification that the building is free <br /> of asbestos containing materials pursuant to <br /> OSHA asbestos regulations goveming <br /> The building must be free of asbestos containing materia~s building owners, 29 CFR Part 1926 <br />Prerequisite 1 Eliminate/control pursuant to OSHA asbestos regulations goveming building including 1926 (k) (communication of <br />Asbestos owners, 29 CFR Part 1929 including 1926(I~ 0 hazards and testing) Leonard Lodder <br />11/2/00 8:07 AM Page 5 leed matrix 7 <br />