Laserfiche WebLink
<br />Credit <br />Description Points <br />Possible <br />Documents Required ontact Person <br />Namelnumber <br /> 1. Subcontractors to provide stamped <br /> drawing(s) marked with the as-built <br /> conditions showing and highlighting the <br /> fresh air intakes as well as the loading <br /> areas, building exhaust fans„cooling <br /> towers; and other sources of contaminatiom, <br /> fresh ai~ intakes are to be distinguished <br /> from sources of contamination with different ' <br /> highligh6ng colors. 2. ProjecYs architect or ` <br /> Comply with ASHRAE `Standard 62-1989, with the proviso engineer shall provide design criteria on <br /> thaf the ambient air quality standard requirements shaU be company lettefiead stating that the project <br />Prerequisite 2 indoor air site spec~c, not region specific. Locate building exhaust complies with t~SHRAE Standard 62-1989; Leonard Lodder; Oliver <br />quality/ventilation/fresh air intakes fans, cooling towers and other sources of contamination 0 ventilation rates'should be highlighted. ' Raab; John Gremmefs` <br /> A signed letter of verification that the <br /> building is to be designated a non-smoking <br /> building should be provided by the <br /> appropriate Department of Insurance for the <br />Prerequisite 3 Smoking ban Prohibit smoking in all areas of the building 0 project, or the Facilities Manager. Jim Sears <br />11/2/00 8:07 AM Page 6 leed matrix 7 <br />