My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LEED- Miscellaneous
>
CS_Courthouse Square
>
LEED- Miscellaneous
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:28:41 AM
Creation date
8/15/2011 2:31:18 PM
Metadata
Fields
Template:
Building
RecordID
10247
Title
LEED- Miscellaneous
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Energy
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
oints ontact Person <br />Credit Description Possible Documents Required Namelnumber <br /> The project's Architect, Engineer, or HVAC <br /> consultant shall provide design criteria on <br /> company letterhead stating that the project <br /> complies with ASHRAE Sta~dard 55-1992. <br /> Highfight the range of values for <br /> temperature, humidity, and air movement <br />Prerequisite 4 Thermal Comfort Gomply with ASHRAE Standard 55-1992 0 that the chosen HVAC system will meet. Oliver Raab. <br /> Develop and implement an IAQ management plan forthe 1. Provide highlighted specifications <br /> construction process which is consistent with`'the SMACNA requiring a IAQ Management Plan for,the <br /> IAQ Guidelines for Occupied Buildings Under Co~struction. construction process which meet the <br /> The plan shall provide for protection of the ventilation requirsments of the Credit. Change;order 2. <br />Construction IAQ management- level system components (equipment and pathways} from Submit a copy of the Gonstruction IAQ Leonard Lodder, John <br />1 contamination `1 Management Plan. Gremmels <br /> In addition to above requirement, reduce construction <br /> contaminants in the building prior to occupancy. If the return <br /> air side of the system is used during construction, provide a <br /> minimum of 85% filtration, as determined by ASHRAE <br /> Standard 52.1-1992, on return-side system components Provide the highlighted specifications for an <br />Construction IAQ management- level during construction and replace all filtration media prior to Advanced Construction IAQ Plan which Leonard Lodder; John <br />2 occupancy. 1 meet the requirements of the credit. Gremmels <br /> 1. Product submittal cut sheets or product <br /> data sheets with highlighted VOC levels. <br /> Contractor to submiYthis information#or all <br /> products (adhesives, sealants, architectural <br /> coatings) used on the project. 2. Provide <br /> Adhesive. At a minimum, all adhesives must meet the VOC letter of certification by the Architect, <br /> limits of South Coast Rule #1168 by the South Coast Air Engineer or Building verifying field use of Leonard Lodder; John <br />Use of low VOC materials-level 1 Quality Management District 1 submitted products. We'll do index. Gremmels <br />11 /2/00 8:07 AM Page 7 leed matrix 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.