Laserfiche WebLink
oints ontact Person <br />Credit Description Possible Documents Required Namelnumber <br /> Sealants. At a minimum, all sealantmust meet Regulation Leonard Lodder, John <br />Use of low VOC materials-level 2 8, Rule 51 of the Bay Area Air Resources-Board. 1 see above Gremmels <br /> Architectural coatings. At a minimum. All paints and <br /> coatings must meetNew Jersey State Department of (included ' <br /> Environmental Protection, Title 7, Chapter 37, Subchapter in point Leonard Lodder; John' <br />Use of low VOC material- level 3 23 above) see above Gremmels ' <br /> Provide highlighted as-built drawings <br /> Install a permanent air monitoring system that has the ("record drawings"), specifications and cut- <br /> capability to monitor supply and retum air and ambient air at sheets for a permanent air monitoring <br /> fresh air intake for`carbon monoxide (CO), carbon dioxide system: Note installation sites'and <br /> (C02), total volatile organic compounds (TVOCs) and emission monitored per Credit <br />Permanent Air monitoring system particulate (including PM10) 1 requirements. Oliver Raab. <br /> Design all Chemical storage/mixing areas for housekeeping <br /> products (central storage facilities and janito~s closets) to <br /> allow for secure product storage in space~ that have water ' <br /> in the chemical concentrate mixing areas, with drains Highlighted as built d~awings of alI chemical <br /> plumbed for the appropriate disposal of liquid waste, and storage areas for housekeeping Oliver Raab; Leonard <br />Desig~ of'Chemical storage Areas separate outside venting, and negative pressure. 1 products. Lodder <br /> Provide highlighfed as-built drawings of all` <br /> major entryways and provide highlighted cut <br /> Include permanent architectural entryway systems (e.g. sheets for each permanent walk-0ff system <br /> grills, grates) designed to catch and holdparticles to keep (grills or grates) that is provided at each of <br />Architectural Entryways them from contaminating the building interior 1 those major entryways. Leonard Lodder. <br />a eguarding ater <br /> Subcontractors to provide stamped <br /> submittal cut sheets of all plumbing fixtures <br /> Comply with Plumbing Fixture Requirements of Energy specified for the project that demonstrates <br />Prerequisite 1 water conservation Policy Act of 1992 0 compliance. Oliver Raab <br />11/2/00 8:07 AM Page 8 leed matrix 7 <br />