My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LEED- Miscellaneous
>
CS_Courthouse Square
>
LEED- Miscellaneous
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:28:41 AM
Creation date
8/15/2011 2:31:18 PM
Metadata
Fields
Template:
Building
RecordID
10247
Title
LEED- Miscellaneous
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Energy
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Points ontact Person <br />Credit Description Possible Documents Required Namelnumber <br /> 1. Highlighted specifications noting that all <br /> new construction materiais shalFbe "lead <br /> free". 2. Highlighted cut sheets that show <br /> all plumbing materials are lead free for <br /> piping, fixtures, solders, and flux used in the <br /> Meet the requirements of EPA Publication #812-B-94_002, p~oject. 3. Letter of certification by'the <br /> Lead inDnnking Water in Schools and Non-Residentiah Architect, Engineer or Builder verifying ~regon Cascade; John <br />Prerequisite 2 lead in drinking water Buildings; April 1994 0 installation per design documents. Gremmels, Oliver Raab <br /> Stamped shop drawing and highlighted <br /> Install oil grit sepa(ators or water quality ponds for specifications of the water quality ponds or <br /> pretreatment of runoff from surface parking areas; consVuct ' oil, grit separators for pre-treatment of runoff <br />Surface runoff flitration underground parking 1 from surface pa~king areas:" Oliver Raab <br />nus r ~t <br /> 1. Credit equivalence form. 2. Back-up <br /> ' information; probably includes case study. ' <br /> Apply for a bonus credit for the level of salvage and Model after Version 2 which describes in ' <br />salvage and recycling recycling that occurred during the demolition 1 detail whatis needed for credit equivalence. <br /> Team includes at least one principal designer who has <br /> satisfactorycompleted a LEED Design Training Course at Copy of the LEED Certified Designer <br />LEED Cedified Designer the Bronze level: 1 Certificate. Leonard Lodder. <br />Total ~~ <br />11/2/00 8:07 AM Page 9 leed matrix 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.