Laserfiche WebLink
NoteslQuestions Status <br /> <br /> Stamped drawing needed for #1 (specificatiohs were provided). #2 DONE <br />Status: LEED Committee has dete~mined that the stated <br />density does not apply to all situations and is granting the <br />credit bases on local circumstances. HLA will need to <br />apply for variance from the credit since area density is <br /><10(J,000 SFlacre. <br />#1 DONE, #2 and #3 not complete. Arbuckle Costic's Sheet A1.1.2 needs to include/note the <br />following five numbers: building square footage (153,293 s~; parking square footage (113,177 s~; <br />total square footage (266,470 sfl; north pad future development{12,726 sfl; total area of site <br />(115,513 sfl. <br />HLA needs to do the calculation showing there are <br />enough bike tacks for 5% of the occupants. <br />DONE (see note). <br />HLA needs to highlight linkages. DONE (see note). <br />HLA needs to highlight linkage to bus mall. DONE (see note). <br />11 /2/00 8:07 AM Page 10 leed matrix 7 <br />