Laserfiche WebLink
Points Points <br />Credit Description Possible Scored <br />CONSERVING MATERIALS AND RESOURCES (Cont.) <br /> In building of four or more stories, install a mechanical <br /> system that allows for floor to floor transportation and <br /> sorting of newspaper, glass, metals, plastics, organic waste <br /> (food and soiled paper), and dry waste for recycling (or <br />Occupant disposal) in separate containers on the ground floor of the <br />Recycling building other than by labar. 1 l <br />Status: Seek variance from LEED Committee. <br />Responsibility: HLA <br />ENHANCING INDOOR ENVIRONMENTAL QUALITY <br />Prerequisite 1 Comply with ASHRAE Standard 62 - 1989, with the <br />Indoor Air proviso that the ambient air quality standard requirements <br />Quality/ shall be site specific, not region specific. Locate building <br />Ventilation/Fresh fresh air intake away from loading areas, building exhaust <br />Air Intakes fans, cooling towers, and other sources of contamination 0 Achieved <br />Prerequisite 2 Prohibit smoking in all areas of the building <br />Smoking Ban 0 Achieved <br />Prerequisite 3 Comply with ASHRAE Standard 55 - 1992 <br />Thermal Comfort 0 Achieved <br />Construction IAQ After completion of construction and prior to occupancy, <br />Management - provision of cleaning requirements for ventilation system <br />Level 1 components and pathways exposed to contamination during <br /> construction 1 <br />Status: Necessary requirements to comply with LEED credit were not included in specifications. <br />Responsibility: General Contractor to estimate cost of complying witl: intent of the credit. <br />Construction IAQ In addition to the above requirement, implement the <br />Management - following: Reduce construction contamination in the <br />Level 2 building prior to occupancy (e.g., dust, particulate, water <br /> infiltration-related contamination, VOC's). If the return air <br /> side of the system is used during construction, provide a <br /> minimum of 85% filtration, as determined by ASHRAE <br /> Standard 52.1 -1992, on return-side system components <br /> during construction and replace all filtration media prior to <br /> occupancy. 1 <br />Status: Necessary requirements to comply with LEED credit were not included in specifications. <br />Responsibility: General Contractor to estimate cost of complying with intent of the credit. <br />Use of Low VOC Adhesives. At a minimum, all adhesives must meet the <br />Materials - VOC limits of South Coast Rule #1168 by the South Coast <br />Level 1 Air Quality Management District 0.5 <br />Status: Language is included in specs. <br />Responsibility: Architect and HLA to track compliance. <br /> Architectural sealants (materials with "adhesive" <br /> characteristics used as a filler; not material used as a <br />Use of Low VOC "coating"). At a minimum, all sealants must meet the limits <br />Materials - of Regulation 8, Rule 51 of the Bay Area Air Resources <br />Level 2 Board. 0.5 <br />Status: Language is included in specs. <br />Responsibility: Architect and HLA to track compliance. <br />