My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LEED- Miscellaneous
>
CS_Courthouse Square
>
LEED- Miscellaneous
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:28:41 AM
Creation date
8/15/2011 2:31:18 PM
Metadata
Fields
Template:
Building
RecordID
10247
Title
LEED- Miscellaneous
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Energy
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Points Points <br />Credit Description Possible Scored <br />ENHANCING INDOOR ENVIRONMENTAL QUALITY (Cont.) <br /> Paints and coatings. At a minimum, all paints and coatings <br />Use of Low VOC must meet the requirements of New Jersey State Department <br />Materials - of Environmental Protection, Title 7, Chapter 37, <br />Level 3 Subchapter 23. 0.5 <br />Status: Language is included in specs. <br />Responsibility: Architect and HLA to track conzpliance. <br /> Design all chemical storage/mixing areas for housekeeping <br /> products (both central storage facilities and janitors closets) <br /> to allow for secure product storage in spaces that have water <br />Design of in the chemical concentrate mixing areas, with drains <br />Chemical Storage plumbed for the appropriate disposal of liquid waste, <br />Areas separate outside venting, and negative pressure. 1 <br />Status: Confirm compliance with Mechanical Engineer. <br />Responsibility: HLA to discuss witl: Mechanical Engineer. <br />Architectural Include permanent architectural entryway systems (e.g. <br />Entryways grills, grates) designed to catch and hold particles to keep <br /> them from contaminating the building interior 1 1 <br />SAFEGUARDING WATER <br />Prerequisite 1 <br />Water Comply with Plumbing Fixture Requirements of Energy <br />Conservation Policy Act of 1992 0 Achieved <br />Prerequisite 2 Meet the requirements of EPA Publication #812-B-94-002, <br />Lead in Drinking Lead in Drinking Water in Schools and Non-Residential <br />Water Buildings, April 1994 0 Achieved <br />Water-Conserving Install fixtures that use 20% less water than the water usage <br />Fixtures requirements in the Energy Policy Act of 1992 1 <br />Status: All fi.ztures do not comply. Must complete water usage study to confirm compliance. <br />Responsibility: Mechanica[ Engineer to conduct water usage study. <br /> Use only plants that are tolerant of climate, soils, and <br /> natural water availability, and that do not receive watering <br />Water-Efficient from municipal potable water after a period of establishment <br />Landscape is complete i <br />Status: Verify compliance with Landscape designer and LEED Committee. <br />Responsibility: HLA <br /> Install oil grit separators or water quality ponds for pre- <br />Surface Runoff treatment of runoff from surface parking areas; construct <br />Filtration underground parking 1 1 <br />DESIGN EXCELLENCE <br />LEED Certified Team includes at least one principal designer who has <br />Designer satisfactarily completed LEED Design Training Course at <br /> the Bronze level ~ <br />Status: A merreber of the Design Team will need to attend trainfng once it is implemented by (ISGBC. <br />Responsibility: Assigned member of the Design Team. <br />Convert Buses to Salem Area Transit indicated that it was planning to convert <br />Natural Gas all the buses to natural gas 1 <br />Status: T~erify intent with Salem Area Transit and credit with LEED Committee. <br />Responsibility: HLA <br />TOTAL 26 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.