My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LEED- Miscellaneous
>
CS_Courthouse Square
>
LEED- Miscellaneous
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:28:41 AM
Creation date
8/15/2011 2:31:18 PM
Metadata
Fields
Template:
Building
RecordID
10247
Title
LEED- Miscellaneous
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Energy
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Courthouse Square Project <br />LEED Compliance Evaluation Matrix <br />October 8, 1999 <br />I. It has been determined that the following credits are likely to be achieved. <br /> Points Points <br />Credit Description Possible Scored <br />SUSTAINABLE SITE PLANNING <br />Landscape <br />Exterior Design to <br />Reduce Heat Use light color/high albedo (with albedo reflectance of at <br />Islands - Part 2 least 0.5) for 80% of the building's roofing surface 1 1 <br /> Place new construction on vacant land located in areas with <br /> an existing development density of at least 100,000 square <br />Infill Development feet per acre l 1 <br />Status: LEED Committee has determined tliat the stated density does not apply to all situations and <br />is granting the credit bases on local circumstances. Warking with City of Salem to obtain necessary <br />documentatio~i. <br />Responsibility: HLA <br />Alternative Provide suitable means for securing bicycles for at least 5% <br />Transportation - of building occupants <br />Part 1 1 * <br />Alternative Provide transit and pedestrian-friendly physical linkages to <br />Transportation - mass transit, such as covered or internal access to subway, <br />Part 3 bus, or trolley stops/stations 1* I <br /> Locate building within '/z mile of a fixed rail station <br />Efficient Building (commuter rail, light rail, or subway) or within '/4 mile of 2 <br />Location or more bus lines 1 1 <br />~ Install refueling facilities for alternative-fuel ve~icles that <br /> use, for example, electricity, natural gas, or <br />Alternative methanol/ethanol. Liquid or gaseous fueling facilities must <br />Fueling Facility be separately ventilated or located outdoors 1 I <br />Status: Rejerence not found in specifications or ad~lendum <br />Responsibi[iry: Architect to indicate where called for in specs/drawings <br /> Develop on a site classified as "brownfield" using EPA <br /> guidelines, including EPA OSWER Directive 9610.17 and <br />Brownfield ASTM Standard Practice Ei739 for site remediation where <br />Development required 1 1 <br />Status: Obtain necessary documentation jrom Oregon DEQ <br />Responsibility: HLA <br />IMPROVING ENERGY EFFICIENCY <br />Prerequisite Comply with state and local energy codes or ASHRAE 90.1 <br />Energy Efficiency - 1989 and subsequent revisions, whichever is stricter 0 Achieved <br />Prerequisite For buildings larger than 50,000 square feet, commission <br />Building the building accarding to the GSA Model Commissioning <br />Commissioning Plan and Guide Specifrcations 0 Achieved <br />Energy Efficiency <br />- Level 1 Meet California Title 24 lighting requirements 1 1 <br />Status: Complete cotle compliance assessment with California Title 241ighting rer~uirements <br />Responsibility: Arcl:itect to gather necessary costs estimates and prepare a cost proposal <br />
The URL can be used to link to this page
Your browser does not support the video tag.