Laserfiche WebLink
Pence/Kelly Construction, inc. Courthouse Square <br />Owner Issue Log <br />Job No: 99006 Date: 11/10/99 <br />=~roject No: 99006 Page: 1 of 6 <br />Number Title Opened Cloaed Status <br />00001 Under Grou~d Storage Tank 3/16/99 4/29/99 CLO <br />00002 RFI 15; Tendon Locators 4l15/99 7/15/99 CLO <br />00005 Proposal Request #1; Stairweli Vent Plan Review 3123/99 70/20199 CLO <br />00006 Proposal Request #2; ElecVical Plan Review 3/23l99 10l27/99 CLO <br />00007 RFI 94; Rigid Insul. in cavity wall Conditions 3/23/99 7/30l99 CLO <br />00008 RFI 38/165; Couplers for Future Building 3/29/99 7/30/99 CLO <br />00009 RFI 58; Area Drains 3/29/99 5/4/99 CLO <br />00010 RFI 54; Fibermesh 3/29/99 5/12/99 CLO <br />00011 RFI 82; 5000# mix on footing pads 3/29/99 4/29/99 CLO <br />00012 Proposal Request #4; Civil Modifications 3/31/99 5/10/99 CLO <br />00013 Gas Conflict at Sewer MH 3/31/99 4/29/99 CLO <br />00014 Remove 3 decommissioned tanks 4/1/99 7/30/99 CLO <br />00015 Proposal Request #3; Standpipe Plan Review 4/2/99 9/9l99 CLO <br />00016 RFI 62; Detail 15/S8.1.5 4/2/99 9/9l99 Cl0 <br />00017 RFI 1; Addendum 1-Added ElecVic 4/2/99 5/4/99 CLO <br />00018 RFI 5; Addendum 3, Item 41.A 4/2/99 6/25/99 CLO <br />00019 RFI 33; Dimension Chng on C-2 col. 4/2/99 5/6/99 CLO <br />00020 RFI 34; Column Chng on G16 col. 4/2/99 7/30/99 CLO <br />00021 RFI 41; Column Terminations. 4/2/99 7/30/99 CLO <br />00022 RFI 56; Added ftg dimensions. 412/99 5/6/99 CLO <br />00023 RFI 59; reduced col. dimensions. 4/2/99 7/30/99 CLO <br />~924 RFI 83; Incr. trans. bars. 4/7J99 5/6/99 CLO <br />025 RFI 85; Chng sheanvall dims. 4!2/99 5/6/99 CLO <br />00026 RFI 86; Chng to 8/54.1.3 4/7J99 5/6/99 CLO <br />00027 RFI 93; CMU sealer • 4!2/99 5/19/99 CLO <br />00028 RFI 96; Brick Lintels 4/2/99 6/28/99 CLO <br />00029 RFI 97; Security grill (~ air shaft 4/2/99 5/3/99 CLO <br />00030 RFI 103; Beam Depth (c~ Arcade 4/6l99 6/29/99 CLO <br />00031 RFI 107; Detail 1/54.1.3 ftg size. 4/6/99 5/12/99 CLO <br />00032 Deleted 4!7/99 5/12/99 CLO <br />00033 RFI 119; Chng to Columns 4/7/99 7/30/99 CLO <br />00034 RFI 37; Slab Structural Detail 4l7/99 7/30/99 CLO <br />00035 RFI 120; Column C-22 Schedule 4/7/99 6/29/99 CLO <br />00036 RFI 64; Detaii change on S22.1 4/7/99 5l3/99 CLO <br />00037 RFI 104/196; Added Column for Bridge 4f1/99 6/29/99 CLO <br />00038 RFI 114; Column Schedule C17 4/7/99 5/3/99 CLO <br />00039 RFI # 44; Handrail ~ Door Opening 4/19/99 5/3/99 CLO <br />00040 RFI # 161; Doors P296A/S199A 4/19/99 5/3/99 CLO <br />00041 RFI # 129; C16 Column (d grid C-12A 4/20/99 5!6/99 CLO <br />00042 RFI # 128; Column lype ~ E-5 S2.1.1 4/20/99 5/6/99 CLO <br />00043 RFI #130; C-16 column terminations 4/20/99 6/30/99 CLO <br />00044 Remove 2000 gallon tank at CouR St. 4/20/99 4/29/99 CLO <br />00045 RFI # 158; Sump Pumps on EI 1&2 4/20l99 7f30/99 CLO <br />00046 RFI # 132; Canopy at grid 13 4/20/99 9/9/99 CLO <br />00047 RFI 89; Glass Block 4/21/99 5/19/99 CLO <br />~048 RFI 126; Struc Hdr detail 3 hr door 4/21/99 10/27/99 CLO <br />~49 Dewatering and Formwork at over ex areas 4/21/99 7/30/99 CLO <br />00050 Contaminated Soil Remova14/9/99 4/21/99 4/29/99 CLO <br />00051 RF184; Electrical Strike Locatlons 4/23/99 7/22/99 CLO <br />00052 RFI 164; Columns at A and C lines 4/29/99 6/29/99 CLO <br />00053 RFI 157; Flr extending on A3.4.3 4/29/99 7/30/99 CLO <br />ReooA R IS 01 <br />