Laserfiche WebLink
Pence/Kelly Constructlon, Inc. Courthouse Square <br />Job No: 99006 <br />~= ~roject No: 99006 <br />~i <br />Owner Issue Log <br />Date: 11/10/99 <br />Page: 2 of 6 <br />Number Title Opened Closed Status <br />00054 RFI 189; Slruc Dtls for CMU grid 11, t0a 4/29/99 8/27/99 CLO <br />00055 RFI 725; Welding Spec for Flagpole 4/29l99 5/10/99 CLO <br />00056 RFI 78; Clear Floor Hardener 4/29/99 7/30/99 CLO <br />00057 Proposal Request #6 Delete waterproofing 4/29/99 10/1/99 CLO <br />00058 Proposal Request #7 delete link seal 4/29/99 7/30/99 CLO <br />00059 Proposal Request #8 Added hose bibb 4/29/99 9/9/99 CLO <br />00060 Proposal Request # 9 Sump pit 4/30/99 9/9/99 CLO <br />00061 Proposal Request # 10 revised door 8 wall ratings 5/t/99 OUT <br />00062 Proposal Request # 11 revise signalization 4128l99 OUT <br />00063 Partnering Cost Savings 4/29/99 7/30/99 CLO <br />00064 RFI 147; Flag Pole Base 4/30/99 5/10/99 CLO <br />00065 RFI 57; Corbell on 2/A3.3.3 4/30/99 7/7f99 CLO <br />00066 RFI 104; Added Column for Bridge 4/30/99 7/30/99 CLO <br />00067 RFI 173; Eliminate Pipe Sleeves 4/30l99 6/30/99 CLO <br />00068 RFI 202; Gypsum Drywall Specification 4/30/99 8/27/99 CLO <br />00069 Contaminated Soil Removal 4/26/99 4/30/99 6/2/99 CLO <br />00070 RFI 143; TS. in Elve #3 in Lieu of Conc. 5/3/99 OUT <br />00071 RFI 190; Delete Support Coiling Doors 5/3/99 8/13/99 CLO <br />00072 RFI 134; Col. Base Anchorage 5/3/99 9/9/99 CLO <br />00073 Proposal Request # 12 Door Frame Revisions 517/99 7/15/99 CLO <br />00074 Demo Underground Vault Wings at Court SVeet 5/6/99 6/2/99 CLO <br />75 Chemeketa Street Parking 5/7/99 7/30/99 CLO <br />~ <br />76 Proposal Request # 5 sidewalk access hatch 5/12/99 10/1/99 CLO <br />00077 Proposal Request # 13 revise glass low E 5/12/99 9/9/99 CLO <br />00078 Proposal Request # 14 Masonry in lieu of conc . 5/12/99 8/11/99 CLO <br />00079 Proposal Request # 15 Revised Fiber Mesh 5/12/99 OUT <br />00080 Skylight Glass VE 5/12/99 7/30/99 CLO <br />00081 Proposal Request #16; Elec Revisions. 5/13/99 9/9/99 CLO <br />00082 Proposal Request #17; Change WC, 5/13/99 7/30/99 CLO <br />00083 VE replace busduct with conduit 8 wire 5/13/99 7/30/99 CLO <br />00084 RFI 223; Increased Duct Size 5/18/99 6/30/99 CLO <br />00085 RFI 224; #10 verts on columns 5/17/99 7/30/99 CLO <br />00086 RFI 182; ElecVic Duct Bank 5/18/99 OUT <br />00087 RFI 199; PT slabs tied to CMU walls 5/18/99 10/1l99 CLO <br />00088 RFI 204; Durometer 60 (ci~ Air Rooms 5/18/99 10/5/99 CLO <br />00089 RFI 212; Support for CMU Partitions 5/18/99 8/27/99 CLO <br />00090 RFI 222; Added PT Cabies 10-10a, K-O 5/18/99 NEW <br />00091 Overexcavation at buiiding foundations 5/21/99 6/29/99 CLO <br />00092 Cont. Soil Removal 4/27 - 5/19 5/21l99 6/2/99 CLO <br />00093 RFI 179; Sprinklers Under Ducts ~ Parking Lvl 5/24l99 9/20i99 CLO <br />00094 Proposal Request # 18a; Luminaire Change 5/26/99 10/27/99 CLO <br />00095 Move Owner shack to Courthouse lawn 5/25/99 7/1/99 CLO <br />00096 Proposal Request 21; Move Gas Pressure Reg 5/27/99 10/1/99 CLO <br />00097 Added rebar at SW shaft 6/1/99 7/30/99 CLO <br />00098 Sup Instruction #1; Truss Camber 6/1/99 7/7/99 CLO <br />^~099 RFI 241; Steel studs ~ Arcades 6/2/99 10/22/99 CLO <br /> <br />~00 RFI 235; Steel Tube Gate Support 6/3/99 NEW <br />00101 RFI 246; Hooked rebar on 182/54.1.1 6/3/99 OUT <br />00102 Proposal Request # 22; Delete door glazing 6/3l99 7/30/99 CLO <br />00103 RFI 242; Conc. beam size 7/S6.1.3 6/4/99 9/9/99 CLO <br />00104 RFI 61; Detail 14/58.1.5 (slab step) 6/4/99 9/9l99 CLO <br />Report R_IS_O1 <br />