My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Salem, City of- Intergovernmental Agreement
>
CS_Courthouse Square
>
Salem, City of- Intergovernmental Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 11:41:43 AM
Creation date
8/16/2011 10:11:59 AM
Metadata
Fields
Template:
Building
RecordID
10284
Title
Salem, City of- Intergovernmental Agreement
Company
City of Salem
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Contracts - Agreements
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGREEMENT <br />Now therefore the parties agree as follows: <br />Improvements Subject to Participation. <br />Improvements to be undertaken in association with the Project by the County <br />and Transit District for which the Agency will provide funding under the terms and <br />conditions of this Agreement include: <br />A. Streetscape. <br />Streetscape improvements are the public improvements to be constructed <br />and located within the public right of way of the four block faces abutting the <br />Courthouse Square development site. Elements of the streetscape include an <br />architecturally designed sidewalk including intersection corner bulbs, curbs, gutters, <br />landscape, street furniture, pedestrian lighting and street lighting. <br />B. Weather Protection. <br />Weather protection improvements are overhead canopy, marquee, or <br />arcade type structures attached to the Courthouse Square building facade extending <br />over the right of way or constructed to be free standing adjacent the right of way. The <br />designed purpose of weather protection improvements is to provide pedestrians an <br />overhead protection from the elements of the weather. <br />C. Traffic Signals. <br />Traffic signals requiring modification or construction to facilitate the <br />interfacing of bus and auto traffic at each of the four intersections adjacent the Project <br />shall include poles, mast arms, signal heads, controller devices, and required electrical <br />service. <br />D. On-Street Transit Facility. <br />The existing transit transfer facility located within the High Street right of <br />way shall be removed upon completion of the transit facility portion of the Project. <br />Elements included in the removal of the existing transfer facility include <br />demolition/salvage of improvements, street surface restoration, and reinstatement of <br />on-street parking. <br />E. Public Utilities <br />Utility improvements include the abandonment of existing public utilities <br />within vacated alley right of way and reconstruction of public utilities consisting of water, <br />storm sewer, and sanitary sewer within the public right of way surrounding the Project. <br />2. Plans and S~ecifications <br />a. Construction plans and specifications are to be prepared by a <br />~ <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.