Laserfiche WebLink
Credit Descri tion Poiot Person Due Date Date Ac uired <br />CONSERVING M ATERIALS AND RESOURCES Cont. <br /> Contractors are to provide highlighted specifications and submit a copy of their <br />Construction Waste Management Plan per Credit requirement. Note Advanced practices in both <br />Waste the specifications and the Plan, Provide report on end of project results for <br />Management - recycling (materials, tons recycled, cost for recycling, savings) and landfilling, <br />Level 2 rovide clin rate. John Gremmels <br /> Provide a compilation of submittals for Local Materials that includes material, <br /> manufacturer, location of manufacturing facility, distance in miles from project <br /> site, and cost for materials. The project Contractor must provide a summary of all <br /> Local Materials supplied to project, the cost for these materials, the total material <br />Use of Loca1 cost for the project, and calculadons that show that the percentage requirement is Leonard Lodder <br />Materials met 20% . John Gremmels <br />Occupant Provide a contract for recycling collection along with a plan describing the <br />R clin buildin wide re clin a roach. Jim Sears <br />ENHANCING IND OOR ENVIRONMENTAL UALITY <br />Prerequisite 1- <br />Elimination & Provide signed certification that the building is free of asbestos containing <br />Control of materials pursuant to OSHA asbestos regularions governing building owners, 29 <br />Asbestos CFR Part 1926 includin 1926 (k communication of hazatds and testin . Leonard Lodder <br /> Subcontractors are to provide stamped drawing(s) marked with the as-built <br /> conditions showing and highlighting the fresh air intakes as well as the loading <br /> areas, building exhaust fans, cooling towers, and other sources of contamination. <br />Prerequisite 2 Distinguish fresh air intakes from sources of contamination with difPerent <br />Indoor Air highlighring colors AND the project's Architect, Engineer, or HVAC consultant <br />Quality/ shall provide design criteria on company letterhead stating that the project Leonard Lodder <br />Ventilation/Fresh complies with ASHRAE Standard 62-1989. Ventilation rates should be Oliver Raab <br />Air Intakes hi i ted, John Gremmels <br /> A signed letter of verification that the building is to be designated a non-smoking <br />Prerequisite 3 building should be provided by the appropriated Department of Insurance for the <br />Smokin Ban ro'ect or the Facilities Man ec ? <br />