Laserfiche WebLink
Credit Descri tion Point Person Due Date Date Ac uired <br />ENHANCING INDOOR ENVIRONMENTAL UALITY Cont. <br /> The pmject's Architect, Engineer, or HVAC consultant shall provide design <br /> criteria on company letterhead stadng t1~at the project complies with ASHRAE <br />Prerequisite 4 Standard 55-1992. Highlight the range of values for temperature, humidity, and Leonard Lodder <br />Thermal Comfort air movement that the chosen HVAC stem will meet. Oliver Raab <br />Permanent Air Provide tvghlighted as-built drawings, specifications and cut-sheets for a <br />Monitonng permanent air monitoring system. Note installation sites and emission monitored <br />S stem r Credit r'rements. Leonard Lodder <br /> Provide highlighted specifications requiring an IAQ Management Plan for the <br />Const-uction IAQ construcUion process, which meet the requirements of the Credit. Submit a copy of <br />Management - the Construction IAQ Management Plan. Provide highlighted specification for an Leonard Lodder <br />Level l and 2 Advanced Construction IA Plan, which meet the r uirements of the Credit. John Gremcnels <br /> Provide product submittal cut sheets or product data sheets (with highlighted VOC <br /> levels} for adhesives, architectural sealants, paints, and coatings. Contractor to <br />Use of Low VOC submit this information for all adhesives, architectural sealants, paints, and <br />Materials - coatings used on the project. Provide a letter of certification by the Architect, Leonard I,odder <br />Level l, 2 and 3 En 'neer or Builder ve ' in the installation of submitted matenals. John Gremmels <br />Design of <br />Chemical Storage Provide highlighted stamped drawings of all chemical storage areas for Oliver Raab <br />Areas housekee 'n roducts. Leonard Lodder <br /> Provide highlighted as built drawings of all major entryways and provide <br />Architectural highlighted cut-sheets for each permanent walk-off system (grill or grates) that is <br />En a s rovided at each of those ma'or ent a s. Leonard Lodder <br />SAFEGUARDING WATER <br />Prerequisite 1 Subcontractors are to provide stamped submittal cut sheets of all plumbing fixtures <br />Water specified for the project that demonstrates compliance under the 1992 Energy <br />Conservation Poli Act. John Gremmels <br />