My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Northblock- RFD Drafts
>
CS_Courthouse Square
>
Northblock- RFD Drafts
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:30:46 PM
Creation date
8/16/2011 3:54:08 PM
Metadata
Fields
Template:
Building
RecordID
10260
Title
Northblock- RFD Drafts
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2. A comparative analysis of supply and demand data broke~~ down by rent levels <br />3. Analysis of demographic and income data for the study area <br />~ <br />Ascribe quantitative and qualitative characteristics to sub-area markets ~vithin study area. <br />E. FEASIBILITY ANALYSIS <br />l. Identify the current (2-5 years) and mid-term (6-15 years) market support and feasibility <br />of each housing type. <br />2. A report on what return on investments developers are expecting on a per unit and per <br />square foot basis by sub-area market within study area. <br />3. Identify location, access, extra-ordinary costs and other factors contributing to the <br />feasibility and those factors limiting feasibility of a residential project at this site. <br />4. Identify a general range of improvements, location, or other measures necessary to make <br />uses feasible within current and mid-term requirements to make desired uses feasible. <br />F QUALITATIVE ANALYSIS <br />Identify issues that could influence or impact the overall feasibility of a residential <br />development on the North End Opportunity Site. These issues could, at minimum, <br />include: <br />a. The need for, and amount of, parking available or necessary to the residential <br />component of the site. <br />b. Zoning and/or land use issues, ~vhich could constrain or limit the feasibility of the <br />site. <br />c. Other issues identified by the Consultant(s). <br />PART III - SUBMITTAL REQUIREMENTS <br />Responses to this market study RFP are due no later than SPM Weekday, Month XX, 1998 to <br />be considered. No facsimile transmittals will be accepted. A~~ original and tltree copies of <br />submittals sl:ould be mai[ed or delivered to: <br />Billy Wasson <br />Courthouse Square Project Co-Cooridnator <br />Marion County <br />4040 Aumsville Highway SE <br />Salem OR 97302 <br />County and Transit intend to make a selection from qualified applicants by Weekdav Month <br />XX, 1998. Please note that your work is confidential. All communication to parties external <br />to this contract should be coordinated through the Marion County and the Salem Area Mass <br />Transit District. The market study will be used by County and Transit for decision-making <br />purposes within the study area in Attachment #1 and County and Transit may at their <br />discretion share the study with other entities. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.