Laserfiche WebLink
Marion County Courthouse Square ~ tiiai9~ 9:38 AM <br />ESTI NIATE D U E V ELOI'M ENT COS"i'S <br />TNlS l3UDGET EXCLUDES ALL STREETSG[PE COSTS <br />Five Story Design -255 Subsurface Par{:ing Stalls <br />Private Tenancy of Speculative Space <br /> EXPE-NDED <br /> BUDGETED TO DATE RE-MAINING <br />L.and Purchase Price $5,314,000 $5,314,000 $0 <br />LAND $5,314,000 SS,314,000 SO <br />COlfN1~Y EXPGNDED TO DA7E(Excludes land cost) 51,717,437 $1,717,437 ~0 <br />TRANSIT EXPENDED TO DATE (Excludes land cost) 5921,994 $921,994 $0 <br />COUNTY COMM[TTGD TO DATE 5790,563 $0 5790,863 <br />CONTRACT02 COST <br />Shell 510,128,810 SO $10,128,810 <br />Pari:ing $3,058,968 50 S3 058,968 <br />Bus Mall $2,152,722 $0 $2,152,722 <br />CONTRAC'I'OR B[D SU(3TOTAL: $15,340,500 $0 $15,340,500 <br />Contractor [3ond (Excluded on Tenant Improvement Work) S1S3,405 ~0 5153,405 <br />Marion Counry (82,959 sf @ S20 + 2g,965 sf @$20 s~ $2,238,480 SO $2,238,480 <br />Salem Area Transit Tenant Improvemenu (20,323sf@ S35) 71 1,305 $0 $711,305 <br />Ground Floor Retail Tenant Improvements(3,870 @$15) 558,050 50 $58,050 <br />Hearing Room (5,265' $65) $342,225 50 $342,225 <br />Subtototal Tenant Improvements $3,350,060 $0 S3,3S0,060 <br />FEES & INSURANCE ~ <br />PermiLs $199,427 $0 $199,427 <br />Sytems Development Charge (Transportation) 56,578 $0 $6,578 <br />Electrical Line Development Charge 5100,000 $0 $100,000 <br />Sanitary / Storm SeHtr SDC 52,000 $0 $2,000 <br />WaterMeters(4") 51,000 $0 51,000 <br />OthaPermiu 517,500 $0 $17,500 <br />Site Testing 522,500 $0 $22,500 <br />Conccete / Steel / Muonry Testing 581,000 $0 $81,000 <br />Builde?s Risk Insurance 523,01 1 $0 $23,011 <br />Misc~llaneous Permits Allo~vance 550,000 $0 $50,000 <br />Subtotal Fees and Insurancc 5503,015 $0 $503,015 <br />TOTAL DIRECT COSTS (Includes Land): $28,09~,27a 5~,953,43] ~20,13~,8a3 <br />IND[RECI' COSTS: <br />ARCliiTL-CTURAL / CONSULTANTS <br />Architects (Tis on County and Transit Space - Excludes Streetscape) $ I,121,434 50 $1 , I 21,434 <br />Engineers includcd above indudcd alwve included abovc <br />Signage Consultant 530,000 $0 $30,000 <br />Other Consultanu S20 000 50 ~20,000 <br />Spacc Plannin~ / 1Vork Drawings SO SO $0 <br />Plan Rcproduction Costs 530,000 $0 $30,000 <br />SublotalArct~itcctural/Consultants $1,201,43a 50 $1,201,434 <br />LOAN FL[S .4ND fINANCIAL COSTS <br />Ap~iraisal S~4 000 ~0 G~4,000 <br />Propcrty Ta~cs Durine Construction S~0 ~0 50 <br /> <br />LOnN FG(:ti ,~ 1 1NANCL~L COSTS SU(3TOTAL_ ---- ---------- - - -- <br />S;a,000 ---------- <br />~0 -- ---------- <br />~S4 O(10 <br />