Laserfiche WebLink
Sent By: PENCE KELLY; <br />• <br />503 364 5383; Jun-4-99 16:06; Page 2/2 <br />addicion to direct wsGs, up to che following amounts may be added to the Contractor's or sub-contractor's <br />direci cos[s to co~er Overhead as defined at,ove for work performui with their own forces: <br />Labur. . . . . . . . . . . .15 % <br />Equipment. . . . . ,10°/a <br />Materials........14% <br />When an suthorized subcontractor performF work, thc C.ontractor will be allowed a suppiemencal mark-up <br />on each piece of subcantract work covered by the change order of 5%. <br />Thesc payments made to ihe Contractor will be comp3ctc cocttpensation for or-erticad, profit, and all othe~ <br />costs that were incurred by tha ContrctcWr ur by other focces fiunished by lhc Contractor, inciuding <br />~ubcontractors. Thcse payments apply to alt cl~ngc ortier work. No other reimbursement, compensati~n, <br />or peymcnt wi11 bo madc. Deducti~z ct~angcs are those which reduce the scnpe of the work. All deducav~ <br />changes will bc r-egotiat~ using the percenragea for labor, equipment, materisl snd subcontractor mark-ups <br />above. <br />• <br />Pl~ase let me naw as saon as possible if T can proceed with my change order pricing per the above <br />guidelines. <br />iacerely, <br />Dave s <br />Projecl Manager <br />Courthouse Squara <br />Dh/gml <br />• <br />