Laserfiche WebLink
~ <br />L~ <br />~ <br />CENTURY WEST <br />SNGINPBRING CORPORATION FIELD OBSERVATION REPORT <br />Project: Courthouse Square Date: 24 August 1999 <br />Client: Marion County Project No. 40806.001.28 <br />At the request of Pence/Kelley, I arrived on site at 2:00 to observe the bottom of excavations <br />where soft material and loose fill was removed in the central area of the site. The area observed <br />today was between grid lines F and J from 8 to 10 to an elevation of approximately 138 feet. <br />The area was excavated to dense native sands and gravels. The area was properly prepared for <br />the placement of engineered fill or concrete. <br />Time on site: 1 hrs <br />Travel time: 2 hrs <br />~_._ ..` . <br />W. Matthew Rogers, Staff Engineer ,~~~ ~~~,-~;,;., ~ <br />, ca~ ~~ ~`r: c ~ :;; ; ~:-.~ ~,. <br />' 15179 y{z: ~ f~ <br />I ~ G-Ta-Zoa7 <br />Reviewed by: William A. Smith, P. ~ ~~ ~o <br />o~r 2' 4~ ~ <br />~YLiAr~ s~°~~ <br />