My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pence Kelley- Contract Review Sheet
>
CS_Courthouse Square
>
Pence Kelley- Contract Review Sheet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 11:41:27 AM
Creation date
8/17/2011 2:38:23 PM
Metadata
Fields
Template:
Building
RecordID
10271
Title
Pence Kelley- Contract Review Sheet
Company
Pence/Kelly
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Contracts - Agreements
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CHANGE ORDER <br />PROJECT: Courthouse Square CHANGE ORDER NUMBER: 21 <br />(name, address) 555 Court Street NE <br /> Salem, Oregon 97301 INITIATION DATE: March 31, 2000 <br /> ARCHITECT'S PROJECT NO.: 9828 <br />TO: Pence/Kelly Construction, Inc. CONTRACT FOR: General Construction <br />(contractor) 2747 Pence Loop SE, P.O. Box 4109 <br /> Salem, Oregon 97302-8109 CONTRACT DATE: February 17, 1999 <br />You are directed to make the following changes in this Contract: <br />1. Provide Changes to Fire Rating of Lobby 1200 per Proposal Request 10, <br /> as per C.O.R. # 40. Deduct $ (3,392.00) <br />2. Provide Changes to Transit Operations Rooms per Proposal Request 70 and RFI 410, <br /> as per C.O.R. # 141. Add $ 10,327.00 <br />3. Provide changes to Parking Garage Entry Gate and Barrier Arms per Proposal <br /> Request 80, as per C.O.R. # 176. Deduct $ (499.00) <br />4. Provide two VOC sensors, one at the top of each of the return air shafts. Sensors to be <br /> wired to units and signal an alarm at the BMS during high VOC conditions, <br /> as per C.O.R. # 184. Add $ 4,915.00 <br />5. Provide for increased column sizes per RFI 362, <br /> as per C.O.R. # 193. Add $ 474.00 <br />6. Provide combination paper towel dispensers/receptacles instead of electric hand <br /> dryers per Proposal Request 85, upgrade electric hand dryers in rooms 1143, 1144 <br /> and 154 per Proposal Request 66, as per C.O.R. # 194. Deduct $ (4,997.00) <br />7. Provide for HVAC workstation to be located at the Courthouse building via coax data line, <br /> as per C.O.R. # 196. Add $ 1,736.00 <br />S. Provide Conduit, Junction boxes and Blocking for CCTV cameras per Proposal Request 62, <br /> as per C.O.R. # 198. Add $ 3,451.00 <br />9. Provide Tapered insulation at mechanical chases between rooftop air handling units. <br /> as per C.O.R. # 205 Add $ 1,299.00 <br />10. Provide Graphic behind Transit Counter per Proposal Request 75 and RFI 430, <br /> as per C.O.R. # 206 Add $ 1,876.00 <br />11. Provide cold water shutoffs for ice makers per RFI 464, <br /> as per C.O.R. # 210 Add $ 1,059.00 <br />12. Provide one non-frostproof sill cock in Canopy along grid "7" at "J". This will tie into <br /> the 2" dia. Main serving Mens' Room 1272. This line needs to be shut down and drained <br /> during freezing weather, as per C.O.R. # 211. Add $ 2,037.00 <br />13. Provide power for future waste disposal units per Proposal Request 90, <br /> as per C.O.R. # 212 Add $ 3,824.00 <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.