anoioo Courthouse Square <br /> Approved COR / CO Log <br /> <br /> COUNTY TRANSIT <br /> APPROVED <br />COR CO AMOUNT DESCRIPTION OF CHANGE ALLOCATION ALLOCATION <br /> <br />COR # 1 1 $ 2,530.00 Decomission, removal and disposal of UST encountered on 3-15-99 $ 2,530 $ - <br /> line conflicts during sewer line relocation <br />l <br />R $ ~,224 $ 54~ <br />COR # 2 1 $ 1,765.00 ve gas <br />eso _ 2~ 5 <br />~ 2 $ - <br />COR # 4 1 $ 12,215.00 Removal and disposal of contaminated soils-203.9 c.y. , <br />$ <br /> 1 00 <br />982 <br />$ 4 removal and disposal of UST encountered along s. blockface <br />Decomission $ 4,982 $ - <br />COR # 5 <br />COR # 6 1 . <br />, <br />450.00 <br />$ 3 , <br />Increase compressive strength of footing pads from 3,000 to 5,000 psi $ 2,393 $ 1,057 <br />COR # 9 2 , <br />$ 16,112.00 Removal and disposal of contaminated soils-268.54 c.y. $ ~6,~ ~ 2 $ <br />COR # 12 2 $ 685.00 Demolition of water vault along Court street $ 475 $ 210 <br />COR # 17 2 $ 41,470.00 Removal and disposal of contaminated soils $ 41,470 $ - <br />20 3 00 <br />993 <br />$ 214 ' Excavation of unsuitable subgrade/fill in areas of unsuitable or contaminated soils $ 159,414 $ 55,579 <br />COR # <br />COR # 21 4 . <br />, <br />697.00 <br />$ 27 Removal and disposal of contaminated soils-461.62 c.y. $ 27,697 $ - <br /> 5 , <br />00 <br />135 <br />$ 14 remove and dispose of three tanks in the NW comer of the site <br />Excavate $ 14,135 $ - <br />COR # 3 <br />COR # 7 5 . <br />, <br />$ 6,966.00 , <br />Additional dewatering costs due to overexcavation $ 4,832 $ 2,134 <br />COR # 8 5 $ 1,876.00 <br />00 <br />394 <br />1 Owner's share of partnering session <br />wall insulation at exterior masonry walls of rooms 1209. 1219 and 1239 <br />Provide cavit $ 938 <br />$ $ 938 <br />COR # 10 <br />COR # 13 5 <br />5 . <br />, <br />$ <br />$ (700.00) y <br />Delete sump pump at elevator #1 (486) $ (214) <br />18 5 00) <br />723 <br />$ (18 VE proposal #1-Delete low "E" coating on ti3 surface of bus mall glass canopy system $ (12,986) $ (5,737) <br />COR # <br />19 5 . <br />, <br />00) <br />744 <br />$ (1 VE proposal #1-Replace 1600 amp bus duct with conduit and wire for feed to rooftop equip . $ (1,210) $ (534) <br />COR # <br /># 22 5 . <br />, <br />00 <br />193 <br />$ 5 Provide couplers at top of parking level columns for future north pad development $ 3 1 <br />COR <br />COR # 23 <br />5 . <br />, <br />$ (440.00) <br />Delete PT tendon locators ~305) (135) <br />$ <br />COR # 26 5 $ 993.00 Revise column ties after fabrication $ 689 <br />$ 373 $ 304 <br />$ 165 <br />COR # 27 5 $ 538.00 Provide column tail revisions 613 <br />$ 6 $ 2,921 <br />COR # 29 5 $ 9,534.00 Revise column reinforcement detail , <br />925 <br />$ 1 $ 850 <br />COR # 30 5 $ 2,775.00 Provide added rebar at isolation joints , <br />$ (750) $ (331) <br />COR # 33 5 $ (1,081.00) Delete link seal and ESP-1 213 <br />$ 4 861 <br />$ 1 <br />COR # 35 5 074.00 <br />$ 6 Revise columns to go to roof level at grids O/11 and O/12 , , <br />COR # 36 5 , <br />$ (2,547.00) Revise column type at grid J-10a $ (1,767) <br />54a $ (780) <br />$ 242 <br />COR # 38 5 $ 790.00 Provide reinforcing at SOG beneath columns $ <br />1 <br />424 $ 629 <br />COR # 39 5 <br />5 $ 2,053.00 <br />00) <br />962 <br />8 <br />$ Provide added footing and column <br />VE proposal #3-Revise precast panels to mitered comers instead of "U" shape , <br />$ <br />$ (6,216) $ (2,746) <br />COR # 42 . <br />, <br />( $ - $ <br />COR # 44 5 $ - Provide flourescent lamp revisions $ - $ <br />COR # 45 5 $ - Provide hollow metal frame revisions $ 668 $ 295 <br />COR # 47 5 $ 963.00 Provide floor hardener at rooms 1209, 1219, and 1239 <br />COR # 48 5 $ 105.00 Change wall mounted water closet to floor mounted water closet in room 1224 $ 32 <br />COR #50 5 $ 315.00 Remove and dispose of UST adjacent to Church Street 315 <br />$ $ <br />COR #53 5 $ 3,186.00 Revise foundation drain pipe specification $ 2,210 <br />839 $ 976 <br />$ 371 <br />COR #54 5 210.00 <br />$ 1 Provide added rebar for pilaster at the SW air shaft $ <br /> , <br />00 lazing <br />es to <br />han <br />id <br />P $ (58) $ (25) <br />COR #56 5 ) <br />$ (83. <br />00 <br />437 <br />32 g <br />g <br />rov <br />e c <br />Provide six parallel parking stalis w/ covered walkway -relocate future job trailers to Churc h $ 22,498 $ 9,939 <br />COR # 28 6 <br />7 . <br />, <br />$ <br />846 <br />00 <br />$ 90 ** Excavation of unsuitable subgrade/fill in areas of unsuitable or contaminated soils $ 67,965 $ 22,881 <br />COR #51 . <br />, $ 3,671 $ 1,621 <br />COR # 24 8 $ 5,292.00 Slab transition revisions $ 16 <br />334 216 <br />$ 7 <br />COR #55 8 $ 23,550.00 Upgrade windows to Sungate 1000 at three buiiding faces , , <br />COR #57 8 $ 1,569.00 Change column in hearing room $ 1,088 <br />$ 569 $ 481 <br />$ 252 <br />COR #59 8 $ 821.00 Added column ties <br />