$ 1,461 $ 646 <br />COR #61 8 $ 2,107.00 A dded rebar on GF1 per shop drawings $ 526 $ 232 <br />COR #62 8 $ 758.00 L uminar base at flagpole 602 <br />$ 1 $ 708 <br />COR #&3 8 $ 2,310.00 Stand pipe changes per PR #3 , <br />$ 28,214 $ 12,464 <br />COR #64 8 $ 40,678.00 Added rebar at pour strips $ (2,497) $ (1,103) <br />COR#65 8 $ (3,600.00) Delete2'sandlayer $ 144 $ 64 <br />COR #66 8 $ 208.00 Added steel bracing at canopy 412 <br />$ 6 $ 2,833 <br />COR #67 8 $ 9,245.00 Change door frames per PR #31 , <br />$ 384 $ 169 <br />COR ilSB 8 $ 553.00 Owner's job shack phone $ 80 $ 36 <br />COR #69 8 $ 116.00 Provide dowels at east stairwell $ 257 $ 114 <br />COR #70 8 $ 371.00 Provide thickened generator slab $ 1,527 $ 674 <br />COR #71 8 $ 2,201.00 Provide changes to air intake 318) <br />$ (3 $ - <br />COR #72 8 $ (3,318.00) NTE credit on removal of three tanks , <br />655 <br />$ 3 $ 1,614 <br />COR #73 8 $ 5,269.00 Provide changes to column base , <br />$ 669 $ 295 <br />COR #78 8 $ 964.00 Added dowels and shear head 115 <br />$ 1 $ 492 <br />COR # 34 9 $ 1,607.00 Add (4) hot water hose bibs per PR #8 , <br />$ 21,735 $ 9,601 <br />COR # 37 9 $ 31,336.00 Provide sump pit per PR #9 $ ~~ 2~ $ ~5~ <br />COR #75 9 $ (17.00) Provide revisions to electrical drawings per PR #16 738 <br />$ 7 $ 3,419 <br />COR #76 9 $ 11,157.00 Provide changes to air at rooms per PR #27 , <br />$ 504 $ 222 <br />COR #82 9 00 <br />$ 726 Provide two additional 4" conduit sleeves in Data/Com room per PR # 29 <br />COR #83 9 . <br />$ 677.00 Provide two additional 1" conduits with pull cords per PR # 28 $ 470 $ 207 <br />COR #84 9 960.00 <br />$ 8 Provide 273 3" conduit sleeves per EC proposal altemate # 32 $ 6,215 $ 2,745 <br />COR #79 10 , <br />520.00 <br />$ 82 Removal and disposal of unsuitable subgrade material $ 57,236 $ 25,284 <br />COR # 31 11 , <br />$ - Provide modifications to public works package per City's requirements $ - $ " <br />COR # 32 11 607.00 <br />$ 4 Provide access hatch and revisions to plumbing and sprinkler system $ 3,195 $ 1,412 <br />COR # 46 11 , <br />759.00) <br />$ (20 Delete bentonite waterproofing and reduce slab thickness in same area $ (14,398) $ (6,361) <br />COR # 49 11 , <br />278.00 <br />$ 7 Provide insulation at rebar dowels and durometer bearing pad per RFI's 199 and 204 $ 5,048 $ 2,230 <br />R #52 11 , <br />934 <br />00 <br />$ 2 Provide dewatering for undocumented fill areas from 5/21/99 to 6/20/99 $ 2,~35 $ 899 <br />CO <br />COR #58 11 . <br />, <br />407.00 <br />$ 1 Provide changes to gas pressure regulators per PR #21 $ 976 $ 431 <br />COR #77 11 , <br />$ - Changes to elevator beams per PR ~i34 <br />i $ - <br />$ 268 $ <br />$ 119 <br />COR #89 11 $ 387.00 t <br />Provide additional rebar at south slab step (gridline D) per structural engineer site vis <br />COR #93 11 $ 855.00 Provide reinforcing at arcade slab per RFI 297 $ 593 <br />1 <br />938 $ 262 <br />$ 856 <br />#94 11 00 <br />794 <br />$ 2 Provide additional reinforcing and 6" hooks per submittal 2F1 and RFI 328 , <br />$ <br />COR <br />COR #95 11 . <br />. <br />558.00 <br />$ 5 Provide changes to nine columns per RFI 317 $ 3,855 $ 1,703 <br />COR #96 11 , <br />$ 405.00 Provide additional reinforcing for arcade beams per RFI 319 $ z8~ $ ~24 <br />COR #99 11 139.00 <br />$ 2 Provide slab continuation at bottom of east and west shafts per RFI 236 $ 1,484 $ 655 <br />COR #102 12 , <br />688.00 <br />$ 33 Removal and disposal of unsuitable subgrade material $ 23,366 $ 10,322 <br />COR #88 13 , <br />$ 21,567.00 Removal and disposal of contaminated soils-359.45 c.y. $ 21~~~ <br />945 $ - <br />$ 417 <br />COR # 14 14 $ 1,362.00 Provide ductwork and supply fan revisions per PR #1 $ <br />195 <br />$ 3 412 <br />$ 1 <br />COR #81 14 00 <br />607 <br />$ 4 Provide concrete ceiling above switch gear and revise CMU walls per RFI 193 , , <br />COR it85 14 , <br />. <br />686.00 <br />$ 4 Provide additional conduit for swing gate operator per approved submittal 02710-001 $ 3,250 $ 1,436 <br />COR #87 14 , <br />$ 877.00 Provide short wall reinforcing at parking garage lobby per RFI 160 $ 608 $ 269 <br />COR #100 14 $ 255.00 Provide changes to exit signs per PR ~i42 $ ~~~ <br />$ 454 $ ~$ <br />$ 200 <br />COR #101 14 $ 654.00 Provide electrical power to the tower clock per RFI 233 $ 204 $ 90 <br />COR #103 14 $ 294.00 Provide changes to bridge connection detail 9/S6.1.1 per RFI 343 $ 329 $ 146 <br />COR #107 14 $ 475.00 Provide additional PT cables and reinforci~g @ grid M/10b <br />COR #110 14 192.00 <br />$ 7 Provide additional reinforcing @ floors 3, 4, 5 per structural shop drawing review $ 4,988 $ 2,204 <br />COR #114 14 , <br />574.00 <br />$ 1 Provide ductile iron for domestic and fire water service in lieu of copper per City of Salem $ 1,092 $ 482 <br /> , <br />00 <br />265 wall and electrical revisions to second floor per PR #2 <br />Provide door ~ 84 $ $~ <br />COR # 11 <br />41 15 <br />15 . <br />$ <br />00 <br />$ 622 , <br />Provide rebar to header above fire doors at parking separation wall per RFI 12 and COR # 41 rev. $ 431 $ 191 <br />COR # <br />COR #108 15 . <br />$ 859.00 Provide changes to luminaires and electrical connections per PR #18 rev. $ 596 $ 263 <br /> 00 <br />532 <br />3 Provide added PT cables at round floor pour'oints per corrected sho drawin s $ 2,450 $ 1,082 <br />COR #115 15 . <br />, <br />$ <br />