Laserfiche WebLink
12~g~gg Courthouse Square <br /> Approved COR / CO Log <br /> COUNTY TRANSIT <br /> APPROVED <br />CO AMOUNT DESCRIPTION OF CHANGE <br />ALLOCATION <br />ALLOCATION <br />COR 1 $ removal and disposai of UST encountered on 3-15-99 <br />00 Decomission <br />530 <br />2 $ 2,530 $ <br />541 <br />COR # 1 <br />COR # 2 1 $ , <br />. <br />, <br />1,765.00 Resolve gas line conflicts during sewer line relocation $ <br />$ 1,224 <br />215 <br />12 $ <br />$ <br />COR # 4 1 $ 12,215.00 Removal and disposal of contaminated soils-203.9 c.y. <br />$ , <br />4 <br />982 <br />$ _ <br />COR # 5 1 $ 4,982.00 Decomission, removal and disposal of UST encountered along s. blockface $ , <br />393 <br />2 $ 057 <br />1 <br />COR # 6 1 $ 3,450.00 Increase compressive strength of footing pads from 3,000 to 5,000 psi $ , <br />112 <br />16 $ , <br />- <br />COR # 9 2 $ 16,112.00 Removal and disposal of contaminated soils-268.54 c.y. $ , <br />475 $ 210 <br />COR # 12 2 $ 685.00 Demoli~on of water vault along Court street $ 470 <br />41 $ <br />COR # 17 2 $ 41,470.00 Removal and disposal of contaminated soils <br />rade/fill in areas of unsuitable or contaminated soils <br />ble sub <br />it <br />f <br />" $ , <br />159,414 $ 55,579 <br />COR # 20 3 $ <br />4 $ g <br />unsu <br />a <br />Excavation o <br />214,993.00 <br />00 Removal and disposal of contaminated soils-461.62 c.y. <br />697 <br />27 $ 2~,69~ $ - <br />COR # 21 <br />COR # 3 5 $ . <br />, <br />14,135.00 Excavate, remove and dispose of three tanks in the NW corner of the site $ <br />$ 14,135 <br />832 <br />4 $ <br />$ <br />134 <br />2 <br />COR # 7 5 $ 6,966.00 Additional dewatering costs due to overexcavation $ , <br />938 $ , <br />938 <br />COR # 8 5 $ 1,876.00 Owner's share of partnering session <br />ovide cavity wall insulation at exterior masonry walls of rooms 1209, 1219 and 1239 <br />00 P <br />94 $ 967 $ 427 <br />COR # 10 5 $ <br />5 $ r <br />. <br />1,3 <br />00) Delete sump pump at elevator #1 <br />(700 $ (486) $ (214) <br />7 <br />COR # 13 <br />COR # 18 5 $ . <br />(18,723.00) VE proposal #1-Delete low "E" coating on #3 surtace of bus mall glass canopy system <br />i $ <br />$ (12,986) <br />210) <br />(1 $ <br />$ (5,73 <br />) <br />(534) <br />COR # 19 5 $ p. <br />(1,744.00) VE proposal #1-Replace 1600 amp bus duct with conduit and wire for feed to rooftop equ <br />t $ , <br />3 <br />602 $ 591 <br />1 <br />COR # 22 5 $ 5,193.00 Provide couplers at top of parking level columns for future north pad developmen $ , <br />(305) $ , <br />(135) <br />COR # 23 5 $ (440.00) Delete PT tendon locators $ 689 $ 304 <br />COR # 26 5 $ 993.00 Revise column ties after fabrication $ 373 $ 165 <br />COR # 27 5 $ 538.00 Provide column tail revisions $ 613 <br />6 $ 2,921 <br />COR # 29 5 $ 9,534.00 Revise column reinforcement detail $ , <br />925 <br />1 $ 850 <br />COR # 30 5 $ 2,775.00 Provide added rebar at isolation joints $ , <br />(750) $ (331) <br />COR # 33 5 $ <br />$ (1,081.00) Delete link seal and ESP-1 <br />00 Revise columns to go to roof level at grids O/11 and O/12 <br />074 <br />6 $ 4,213 $ 1,861 <br />COR # 35 <br />COR # 36 5 <br />5 $ . <br />, <br />(2,547.00) Revise column type at grid J-10a $ <br />$ (1,767) <br />548 $ <br />$ (780) <br />242 <br />COR # 38 5 $ 790.00 Provide reinforcing at SOG beneath columns g 424 <br />1 $ 629 <br />COR # 39 5 $ <br />5 $ 2,053.00 Provide added footing and column <br />00) VE proposal #3-Revise precast panels to mitered corners instead of "U" shape <br />962 <br />(8 <br />$ , <br />(6,216) <br />$ <br />(2,746) <br />COR # 42 . <br />, <br />COR # 44 5 $ - Provide flourescent lamp revisions $ _ $ _ <br />COR # 45 5 $ - Provide hollow metal frame revisions $ g6g $ 295 <br />COR # 47 5 $ 963.00 Provide floor hardener at rooms 1209, 1219, and 1239 <br />$ 73 $ 32 <br /> 5 $ 00 Change wall mounted water closet to floor mounted water closet in room 1224 <br />105 <br />COR # 48 <br />COR #50 5 $ . <br />315.00 Remove and dispose of UST adjacent to Church Street $ <br />$ 315 <br />210 <br />2 $ <br />$ - <br />976 <br />COR #53 5 $ 3,186.00 Revise foundation drain pipe specification $ , <br />839 $ 371 <br />COR #54 5 $ 1,210.00 Provide added rebar for pilaster at the SW air shaft $ (58) $ (25) <br />COR #56 5 $ (83.00) Provide changes to glazing <br />