6 $ 00
<br />437
<br />32 Provide six parallel parking stalls w/ covered walkway -relocate future job trailers to Church $ 22,498 $ 9,939
<br />COR # 28 7 $ .
<br />,
<br />00
<br />846
<br />90 *" Excavation of unsuitabie subgrade~ll in areas of unsuitable or contaminated soils $ 67,965 $ 22,881
<br />COR #51
<br />COR # 24 8 $ .
<br />,
<br />5,292.00 Slab transition revisions $
<br />$ 3,671
<br />334
<br />16 $
<br />$ 1,621
<br />216
<br />7
<br />COR #55 8 $ 23,550.00 Upgrade windows to Sungate 1000 at three building faces $ ,
<br />088
<br />1 $ ,
<br />481
<br />COR #57 - 8 $ 1,569.00 Change column in hearing room $ ,
<br />569 $ 252
<br />COR #59 8 $ 821.00 Added column ties $ 461
<br />1 $ 646
<br />COR #61 8 $ 2,107.00 Added rebar on GF1 per shop drawings $ ,
<br />526 $ 232
<br />COR #62 8 $ 758.00 Luminar base at flagpole $ 602
<br />1 $ 708
<br />COR #63 8 $ 2,310.00 Stand pipe changes per PR #3 $ ,
<br />214
<br />28 $ 12,464
<br />COR #64 8 $ 40,678.00 Added rebar at pour strips $ ,
<br />497)
<br />(2 $ (1,103)
<br />COR #65 8 $ (3,600.00) Delete 2' sand layer $ ,
<br />144 $ 64
<br />COR #66 8 $ 208.00 Added steel bracing at canopy $ 412
<br />6 $ 2,833
<br />COR #67 8 $ 9,245.00 Change door frames per PR #31 $ ,
<br />384 $ 169
<br />COR #68 8 $ 553.00 Owner's job shack phone $ 80 $ 36
<br />COR #69 S $ 116.00 Provide dowels at east stairweil $ 257 $ 114
<br />COR #70 8 $ 371.00 Provide thickened generator slab $ 527
<br />1 $ 674
<br />COR #71 8 $ 2,201.00 Provide changes to air intake $ ,
<br />318)
<br />(3 $ -
<br />COR #72 8 $ (3,318.00) NTE credit on removal of three tanks $ ,
<br />655
<br />3 $ 1,614
<br />COR #73 8 $ 5,269.00 Pravide changes to column base $ ,
<br />115
<br />1 $ 492
<br />COR # 34 9 $ 1,607.00 Add (4) hotwater hose bibs per PR #8 $ ,
<br />735
<br />21 $ 9,601
<br />COR # 37 9 $ 31,336.00 Provide sump pit per PR #9 $ ,
<br />(12) $ (5)
<br />COR #75 9 $ (17.00) Provide revisions to electrical drawings per PR #16 $ 738
<br />7 $ 3,419
<br />COR #76 9 $ 11,157.00 Provide changes to air at rooms per PR #27 $ ,
<br />ss9 $ 295
<br />COR #78 9 $ 964.00
<br />00
<br />726 Added dowels and shear head
<br />Provide two addfional 4" conduit sleeves in Data/Com room per PR # 29 $ 504 $ 222
<br />COR #82
<br />COR #83 9
<br />9 $
<br />$ .
<br />677.00 Provide iwo additional 1" conduits with pull cords per PR # 28 $ 470 $ 207
<br />COR #84 9 $ 8,960.00 Provide 273 3" conduit sleeves per EC proposal afternate # 32 $
<br />$ 6,215
<br />236
<br />57 $
<br />$ 2,745
<br />284
<br />25
<br />COR #79 10 $ 82,520.00 Removal and disposal of unsuitable subgrade material
<br />' $ ,
<br />- $ ,
<br />COR # 31 11 $ - s requirements
<br />Provide modifications to public works package per City $ 195
<br />3 $ 412
<br />1
<br />COR # 32 11 $ 4,607.00 Provide access hatch and revisions to plumbing and sprinkler system $ ,
<br />398)
<br />(14 $ ,
<br />(6
<br />361)
<br />COR # 46 11 $ (20,759.00) Delete bentonite waterproofing and reduce slab thickness in same area
<br />04
<br />' $ ,
<br />048
<br />5 $ ,
<br />230
<br />2
<br />COR # 49 11 $ 278.00
<br />7 s 199 and 2
<br />Provide insulation at rebar dowels and durometer bearing pad per RFI , ,
<br />COR #52 11 $ ,
<br />934.00
<br />2 Provide dewatering for undocumented fill areas from 5/21/99 to 6/20/99 $ 2,035 $ 899
<br />COR #58 11 $ ,
<br />1,407.00 Provide changes to gas pressure regulators per PR #21 $ 976 $
<br />$ 431
<br />~
<br />COR #77 11 $ -
<br />0 Changes to elevator beams per PR #34
<br />additional rebar at south slab step (gridline D) per structural engineer site visit
<br />id
<br />P $
<br />$ "
<br />268 $ 119
<br />COR #89
<br />COR #93 11
<br />11 $
<br />$ 387.0
<br />855.00 e
<br />rov
<br />Provide reinforcing at arcade slab per RFI 297 $ 593
<br />938
<br />1 $
<br />$ 262
<br />856
<br />COR #94 11 $ 794.00
<br />2 Provide additional reinforcing and 6" hooks per submittal 2F1 and RFI 328 $ ,
<br />COR #95 11 $ ,
<br />5,558.00 Provide changes to nine columns per RFI 317 $ 3,855
<br />281 $
<br />$ 1,703
<br />124
<br />COR #96 11 $ 405.00 Provide additional reinforcing for arcade beams per RFI 319 $
<br />$ 484
<br />1 $ 655
<br />COR #99 11 $ 2,139.00 Provide slab continuation at bottom of east and west shafts per RFI 236 $ ,
<br />366
<br />23 $ 10
<br />322
<br />COR #102 12 $ 33,688.00 Removal and disposal of unsuitable subgrade material , ,