Laserfiche WebLink
6 $ 00 <br />437 <br />32 Provide six parallel parking stalls w/ covered walkway -relocate future job trailers to Church $ 22,498 $ 9,939 <br />COR # 28 7 $ . <br />, <br />00 <br />846 <br />90 *" Excavation of unsuitabie subgrade~ll in areas of unsuitable or contaminated soils $ 67,965 $ 22,881 <br />COR #51 <br />COR # 24 8 $ . <br />, <br />5,292.00 Slab transition revisions $ <br />$ 3,671 <br />334 <br />16 $ <br />$ 1,621 <br />216 <br />7 <br />COR #55 8 $ 23,550.00 Upgrade windows to Sungate 1000 at three building faces $ , <br />088 <br />1 $ , <br />481 <br />COR #57 - 8 $ 1,569.00 Change column in hearing room $ , <br />569 $ 252 <br />COR #59 8 $ 821.00 Added column ties $ 461 <br />1 $ 646 <br />COR #61 8 $ 2,107.00 Added rebar on GF1 per shop drawings $ , <br />526 $ 232 <br />COR #62 8 $ 758.00 Luminar base at flagpole $ 602 <br />1 $ 708 <br />COR #63 8 $ 2,310.00 Stand pipe changes per PR #3 $ , <br />214 <br />28 $ 12,464 <br />COR #64 8 $ 40,678.00 Added rebar at pour strips $ , <br />497) <br />(2 $ (1,103) <br />COR #65 8 $ (3,600.00) Delete 2' sand layer $ , <br />144 $ 64 <br />COR #66 8 $ 208.00 Added steel bracing at canopy $ 412 <br />6 $ 2,833 <br />COR #67 8 $ 9,245.00 Change door frames per PR #31 $ , <br />384 $ 169 <br />COR #68 8 $ 553.00 Owner's job shack phone $ 80 $ 36 <br />COR #69 S $ 116.00 Provide dowels at east stairweil $ 257 $ 114 <br />COR #70 8 $ 371.00 Provide thickened generator slab $ 527 <br />1 $ 674 <br />COR #71 8 $ 2,201.00 Provide changes to air intake $ , <br />318) <br />(3 $ - <br />COR #72 8 $ (3,318.00) NTE credit on removal of three tanks $ , <br />655 <br />3 $ 1,614 <br />COR #73 8 $ 5,269.00 Pravide changes to column base $ , <br />115 <br />1 $ 492 <br />COR # 34 9 $ 1,607.00 Add (4) hotwater hose bibs per PR #8 $ , <br />735 <br />21 $ 9,601 <br />COR # 37 9 $ 31,336.00 Provide sump pit per PR #9 $ , <br />(12) $ (5) <br />COR #75 9 $ (17.00) Provide revisions to electrical drawings per PR #16 $ 738 <br />7 $ 3,419 <br />COR #76 9 $ 11,157.00 Provide changes to air at rooms per PR #27 $ , <br />ss9 $ 295 <br />COR #78 9 $ 964.00 <br />00 <br />726 Added dowels and shear head <br />Provide two addfional 4" conduit sleeves in Data/Com room per PR # 29 $ 504 $ 222 <br />COR #82 <br />COR #83 9 <br />9 $ <br />$ . <br />677.00 Provide iwo additional 1" conduits with pull cords per PR # 28 $ 470 $ 207 <br />COR #84 9 $ 8,960.00 Provide 273 3" conduit sleeves per EC proposal afternate # 32 $ <br />$ 6,215 <br />236 <br />57 $ <br />$ 2,745 <br />284 <br />25 <br />COR #79 10 $ 82,520.00 Removal and disposal of unsuitable subgrade material <br />' $ , <br />- $ , <br />COR # 31 11 $ - s requirements <br />Provide modifications to public works package per City $ 195 <br />3 $ 412 <br />1 <br />COR # 32 11 $ 4,607.00 Provide access hatch and revisions to plumbing and sprinkler system $ , <br />398) <br />(14 $ , <br />(6 <br />361) <br />COR # 46 11 $ (20,759.00) Delete bentonite waterproofing and reduce slab thickness in same area <br />04 <br />' $ , <br />048 <br />5 $ , <br />230 <br />2 <br />COR # 49 11 $ 278.00 <br />7 s 199 and 2 <br />Provide insulation at rebar dowels and durometer bearing pad per RFI , , <br />COR #52 11 $ , <br />934.00 <br />2 Provide dewatering for undocumented fill areas from 5/21/99 to 6/20/99 $ 2,035 $ 899 <br />COR #58 11 $ , <br />1,407.00 Provide changes to gas pressure regulators per PR #21 $ 976 $ <br />$ 431 <br />~ <br />COR #77 11 $ - <br />0 Changes to elevator beams per PR #34 <br />additional rebar at south slab step (gridline D) per structural engineer site visit <br />id <br />P $ <br />$ " <br />268 $ 119 <br />COR #89 <br />COR #93 11 <br />11 $ <br />$ 387.0 <br />855.00 e <br />rov <br />Provide reinforcing at arcade slab per RFI 297 $ 593 <br />938 <br />1 $ <br />$ 262 <br />856 <br />COR #94 11 $ 794.00 <br />2 Provide additional reinforcing and 6" hooks per submittal 2F1 and RFI 328 $ , <br />COR #95 11 $ , <br />5,558.00 Provide changes to nine columns per RFI 317 $ 3,855 <br />281 $ <br />$ 1,703 <br />124 <br />COR #96 11 $ 405.00 Provide additional reinforcing for arcade beams per RFI 319 $ <br />$ 484 <br />1 $ 655 <br />COR #99 11 $ 2,139.00 Provide slab continuation at bottom of east and west shafts per RFI 236 $ , <br />366 <br />23 $ 10 <br />322 <br />COR #102 12 $ 33,688.00 Removal and disposal of unsuitable subgrade material , , <br />