COR #88 13 $ 21,567.00 Remova~ and disposal of contaminated soils-359.45 c.y. $ <br />$ 21,567 <br />945 $ <br />$ - <br />417 <br />COR # 14 14 $ 1,362.00 Provide ductwork and suppiy fan revisions per PR #1 $ 195 <br />3 $ 412 <br />1 <br />COR #81 14 $ 607.00 <br />4 Provide concrete ceiling above switch gear and revise CMU walls per RFI 193 , , <br />269 <br />COR #87 14 $ , <br />877.00 Provide short wail reinforcing at parking garage lobby per RFI 160 $ 608 <br />~~~ $ <br />$ 78 <br />COR #100 14 $ 255.00 Provide changes to e~dt signs per PR #42 $ <br />$ 454 $ 200 <br />COR #101 14 $ 654.00 Provide electrical power to the tower clock per RFI 233 $ 204 $ 90 <br />COR #103 14 $ 294.00 Provide changes to bridge connection detail 9/S6.1.1 per RFI 343 <br />f S <br />l $ 092 <br />1 $ 482 <br />COR #114 14 $ 574.00 <br />1 em <br />a <br />Provide ductile iron for domestic and fire water service in lieu of copper per City o , 81 <br />COR # 11 15 $ , <br />265.00 Provide door, wall and electrical revisions to second floor per PR #2 $ 184 <br />431 $ <br />$ 191 <br /> 15 $ 00 <br />622 Provide rebar to header above fire doors at parking separation wall per RFI 12 and COR #41 re $ <br />COR # 41 <br />COR #108 15 $ . <br />859.00 Provide changes to luminaires and electrical connections per PR #18 rev. $ 596 $ 263 <br />COR #115 15 $ 532.00 <br />3 Provide added PT cables at ground floor pourjoints per corrected shop drawings $ 2,450 $ 1,082 <br />COR #116 15 $ , <br />(58.00) Provide changes to transformer room per PR #40 <br />sulation in lieu of 3" semi rigid insulation under the suspended slab per VER # <br />tt i <br />4" b <br />d $ <br />$ (40) <br />(6,462) $ <br />$ (18) <br />(2,855) <br />COR #118 <br />19 15 <br />15 $ <br />$ (9,317.00) <br />00 <br />6 <br />923 a <br />n <br />e <br />Provi <br />Provide dowels at parking level SOG joints. Grind where SOG has been poured and has curle $ 4,802 $ 2,121 <br />COR #1 15 $ , <br />. <br />00) <br />640 <br />(10 Provide series rated switch-gear in lieu of specified system per VER #5 $ (7,380) $ (3,260) <br />COR #121 15 $ . <br />, <br />00 <br />081 <br />2 Stop gypsum board 6" above ceiling height at all perimeter walls per VER #14 $ 1,443 $ 638 <br />COR #122 <br />23 15 $ . <br />, <br />00) <br />200 <br />(5 Deduct cost of all foreign made reinforcing that has been supplied for use on project $ (3,607) $ (1,593) <br />COR #1 <br />COR #124 15 $ . <br />, <br />289.00 Provide conduit for PGE vault per PR #56 <br />RM 322 <br />l i $ <br />$ 200 <br />91 <br />812 $ <br />$ 89 <br />- <br />COR #105 16 $ 00 <br />812 <br />91 n <br />Provide space saver filing system per PR #41-electric assist in RM 3145/mechanica , <br />COR # 43 17 $ . <br />, <br />498.00 <br />6 Provide concrete beam and column to encase electrical duct bank per RFI 182 $ 4,507 $ 1,991 <br />COR #80 17 $ , <br />2,061.00 Provide increased plate sizes per RFI 318 <br />k manufactured by Action Pride in lieu of specified manufacturer per VER #7 <br />d $ <br />$ 1,430 <br />(2,924) $ <br />$ 631 <br />(1,291) <br />COR #98 <br />COR #111 17 <br />17 $ <br />$ (4,215.00) <br />205,994.00 e casewor <br />Proi <br />Provide tenant improvement modifications per PR #50 $ 205,994 $ <br />$ <br />647 <br />9 <br />COR #112 17 $ 9,647.00 Provide tenant improvement modiflcations per PR #51 $ <br />$ - <br />300 <br />4 $ , <br />899 <br />1 <br />COR #124 17 $ 6,199.00 Provide additional fire extinguishers and cabinets per PR #23 $ , <br />613 <br />1 $ , <br />713 <br />COR #125 17 $ 2,326.00 Provide changes to elevator cab per PR #37 $ , <br />134 <br />1 $ 501 <br />COR #127 17 $ 1,635.00 Provide brick control joints per RFI 243 $ , <br />- $ - <br />COR #128 17 $ - Provide changes to door glass per PR #43 <br />duit across Court Street w/ fiber optics connection (Alternate 'A") per PR #36 <br />id $ 47,227 $ 20,863 <br />COR #129 <br />0 17 <br />17 $ <br />$ 68,090.00 <br />00 <br />500 <br />(1 e con <br />Prov <br />) Provide sheet drain at perimeter retaining wall in lieu of drain rock and filter fabric per VER #15 $ (1,040) $ (460) <br />COR #13 17 $ . <br />, <br />00 <br />292 Provide access hatch changes to restrooms #'s 1144, 1153, 1154 per RFI 388 $ 203 $ 89 <br />COR #133 <br />COR #136 17 $ . <br />974.00 <br />8 Provide changes to elevator machine room per PR #60 and RFI 323 $ 6,224 $ 2,750 <br />COR #143 17 $ , <br />2,101.00 Provide changes to doors and partitions per PR #33 $ <br />$ 1,457 <br />709 $ <br />$ 644 <br />313 <br />COR #147 17 $ 1,022.00 Provide bus driveway connection per RFI 374 $ 796 $ 352 <br />COR #149 17 $ 1,148.00 Provide changes to steel pipe support at bay windows per RFI 374 675 $ 298 <br />COR #150 17 $ 973.00 Provide for increased column sizes per RFI 227 $ <br />$ 433 <br />1 $ 633 <br />COR #151 17 $ 2,066.00 Provide corner guards per RFI 414 $ , <br />679 $ 300 <br />COR #155 17 $ 979.00 Provide infill to underside of north stairs per PR #73 __ _____ _- _ <br />______ <br /> $1,167,003.00 Total Committed-Construction Change Orders $ 951,069 $ 215,934 <br />