My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pence Kelley- Site Work Reports
>
CS_Courthouse Square
>
Pence Kelley- Site Work Reports
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:33:24 PM
Creation date
8/17/2011 3:19:34 PM
Metadata
Fields
Template:
Building
RecordID
10275
Title
Pence Kelley- Site Work Reports
Company
Pence/Kelly
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ <br />Courthouse Square <br />Act <br />ID <br />Description <br />Orig Rem Early Early Total JUL <br />Dur Dur Start Finish Float <br />1000 <br />1010 <br />1020 <br />1030 <br />1040 <br />1050 <br />1060 <br />1070 <br />1080 <br />1090 <br />1100 <br />1110 <br />1120 <br />1130 <br />1140 <br />1150 <br />1160 <br />1170 <br />1180 <br />1190 <br />1210 <br />1220 <br />1300 <br />1200 <br />1205 <br />1209 <br />1214 <br />1219 <br />1225 <br />1230 <br />1240 <br />1250 <br />1260 <br />1270 <br />1280 <br />1290 <br />2000 <br />2005 <br />2010 <br />2020 <br />2025 <br />Mass Excavation <br />skylight structural steel <br />clock tower structural steel <br />frp arcade columns and beams <br />steel truss structures <br />paint skylight structure <br />skylight glazing system <br />electrical rough-in <br />plumbing rough-in <br />metal stud framing and sheetin <br />masonry <br />north steel canopies <br />sheet metal/membrane roofing <br />clocks <br />waterproof inembrane/drainage matt <br />curbs, sidewalks and topping slab <br />brick pavers <br />electrical finishes <br />fencing <br />signage <br />street furnishinqs <br />Sanitary Sewer @ Chemeketa <br />wp/backfill perimeter wall full height ( <br />wp/backfill perimeter wall full height ( <br />wp/backfill perimeter wall full height ( <br />wp/backfill perimeter wall full height ( <br />underground utilities (storm, sewer & <br />signalization <br />curb and gutter <br />sidewalk and <br />brick pavers <br />site furnishin~ <br />Shearwall ftg excavation <br />Excavate pads along A& 12a line <br />frp continuous footings <br />A & 12a line <br />I~ I Pence/Kelly Construction, Inc. <br />~ <br />~ <br />1999 <br />AUG SEP <br />45 2 22MAR99 A 06AUG99 350d Mass Excavation <br />10 10 25JAN00 07FE600 76d <br />8 8 08FEB00 17FEB00 76d <br />15 15 18FE600 09MAR00 76d <br />10 10 10MAR00 23MAR00 76d <br />5 5 24MAR00 30MAR00 76d <br />35 35 31 MAR00 18MAY00 76d <br />10 10 24MAR00 06APR00 134d <br /> 5 5 24MAR00 30MAR00 139d <br />1 8 18 07APR00 02MAY00 134d <br />1 6 16 21APR00 12MAY00 134d <br /> 8 8 15MAY00 24MAY00 134d <br />1 0 10 03MAY00 16MAY00 137d <br /> 3 3 17MAY00 19MAY00 137d <br /> 8 8 25MAY00 05JUN00 134d <br />3 0 30 19MAY00 29JUN00 76d <br />4 0 40 09JUN00 04AUG00 76d <br />1 5 15 24JUL00 11AUG00 76d <br /> 8 8 14AUG00 23AUG00 78d <br /> 3 3 14AUG00 16AUG00 81d <br /> 5 5 14AUG00 18AUG00 81d <br /> 6 6 14AUG00 21AUG00 80d <br />1 0 10 14AUG00 25AUG00 76d <br />41 0105APR99 A I 07APR99 A <br /> 8 8 10AUG99 19AUG99 247d <br /> 8 8 17DEC99 28DEC99 162d <br /> 8 8 25JAN00 03FEB00 166d <br />1 0 10 10FEB00 23FE600 162d <br />1 6 16 29DEC99 19JAN00 162d <br />2 5 25 20JAN00 23FEB00 162d <br /> 6 6 24FEB00 02MAR00 162d <br /> 4 4 03MAR00 08MAR00 195d <br /> 2 2 09MAR00 10MAR00 195d <br />2 0 20 24FEB00 22MAR00 162d <br />3 0 30 09MAR00 19APR00 162d <br /> 5 5 20APR00 26APR00 162d <br />3 0 12MAY99 A 24MAY99 A <br />1 0 25MAY99 A 25MAY99 A ine <br />6 0 19APR99 A 30APR99 A <br />6 0 21APR99 A 13MAY99 A <br />4 0 26MAY99 A 28MAY99 A ne <br />wplbackfill <br />
The URL can be used to link to this page
Your browser does not support the video tag.