My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pence Kelley- Site Work Reports
>
CS_Courthouse Square
>
Pence Kelley- Site Work Reports
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:33:24 PM
Creation date
8/17/2011 3:19:34 PM
Metadata
Fields
Template:
Building
RecordID
10275
Title
Pence Kelley- Site Work Reports
Company
Pence/Kelly
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~-` <br />Act <br />ID Description <br />2040 frp west shear wall footing <br />2050 backfill shearwall footing <br />2060 frp perimeter wall <br />2070 frp columns <br />2090 sog prep grid A-D <br />2100 fp sog grid A-D <br />2110 masonry bearing walls grid A-D <br />2120 sog prep grid D-E.5 <br />2130 fp sog grid D-E.5 <br />2140 masonry bearing walls grid C.5-G.5 <br /> 1999 <br />Orig <br />Dur Rem <br />Dur Early <br />Start Early <br />Finish Total <br />Float ~UL AUG <br />19 6 2 9 16 <br />12 0 26MAY99 A 08JUN99 A ting <br />4 0 08JUN99 A 11JUN99 A ting <br />9 0 30APR99 A 28MAY99 A <br />6 0 08JUN99 A 15JUN99 A <br />2 0 14JUN99 A 15JUN99 A D <br />2 0 16JUN99 A 17JUN99 A <br />2 0 22JUN99 A 28JUN99 A <br />2 0 16JUN99 A 17JUN99 A <br />2 0 18JUN99 A 21JUN99 A <br />3 0 23JUN99 A 25JUN99 A <br />2300 sump pit excavation 2 0 02JUN99 A 03JUN99 A <br />2310 frp continuous footings 4 0 06MAY99 A 02JUN99 A <br />2320 frp sump pit 10 0 09JUN99 A 17JUN99 A <br />2330 frp pad footings 6 0 15JUN99 A 23JUN99 A <br />2333 shotcrete crane footing area 7 0 04MAY99 A 10MAY99 A <br />2336 frp crane footing 6 0 11 MAY99 A 18MAY99 A <br />2338 frp walls at water vault 5 0 07JUN99 A 11JUN99 A <br />2340 backfill footings/sump pit 6 0 16JUN99 A 29JUN99 A <br />2350 frp perimeter walls 6 0 27MAY99 A 01JUN99 A <br />2360 frp columns 3 0 21JUN99 A 24JUN99 A <br />2370 frp west shear wall 9 0 10JUN99 A 28JUN99 A <br />2380 underground utlities 2 0 25JUN99 A 28JUN99 A <br />2390 sog prep 2 0 28JUN99 A 29JUN99 A <br />2400 fp sog 3 0 29JUN99 A 01JUL99 A <br />2500 structural excavation 5 <br />2510 frp perimeter footing 5 <br />2520 frp pad footings 6 <br />2530 frp east shear footing 10 <br />2540 backfill footings 2 <br />2550 frp perimeter wall 8 <br />2555 frp ramp footings 4 <br />2560 frp ramp walis 4 <br />2562 backfill ramp 2 <br />2565 frp ramp slab 2 <br />2570 fr columns 3 <br />2580 frp east shear wall 8 <br />2590 underground utilities 2 <br />2600 sog prep 2 <br />2610 fp sog 3 <br />2620 masonry bearing walls 3 <br />2690 set tower crane 3 <br />2700 form slab 8 <br />2710 rebar/tendons 4 <br />2715 form depressed areas 2 <br />2720 mechanical/electrical 3 <br />2730 pour slab ~ <br />2740 stress tendons 1 <br />2750 strip forms 6 <br />2760 frp columns 3 <br />2765 arcade walls 5 <br />I~ I Pence/Kelly Construction, Inc. <br />0128APR99 A 122JUN99 A <br />0 04MAY99 A 26MAY99 A <br />0 02JUN99 A 30JUN99 A <br />0 07MAY99 A 21 MAY99 A <br />0 01JUL99 A 01JUL99 A <br />0 01JUN99 A 10JUN99 A <br />0 18JUN99 A 30JUN99 A <br />0 02JUL99 A 09JUL99 A <br />0 12JUL99 A 14JUL99 A <br />0 19JUL99 A 19JUL99 A <br />0 22JUN99 A 29JUN99 A <br />0 04JUN99 A O6JUL99 A <br />0 28JUN99 A 29JUN99 A <br />0 06JUL99 A 07JUL99 A <br />0 08JUL99 A 08JUL99 A <br />0112JUL99 A 114JUL99 A <br />0115JUN99 A I 15JUN99 A <br />0 28JUN99 A 08JUL99 A <br />0 08JUL99 A 16JUL99 A <br />0 19JUL99 A 20JUL99 A <br />0 06JUL99 A 20JUL99 A <br />0 21JUL99 A 21JUL99 A <br />0 26JUL99 A 26JU199 A <br />0 27JUL99 A 03AUG99 A <br />2 19JUL99 A O6AUG99 <br />1 19JUL99 A 05AUG99 <br />bearing walls grid A-D <br />E.5 I <br />E.5 <br />aring walls grid C.5-G.5 <br />igs <br />alt <br />~otings/sump pit <br />hear wall <br />nd utlities <br />footings <br />footings <br />ramp wall <br />backfill ramP <br />L1~ frp ramp slab <br />mns I <br />ast shear wall <br />und utilitie <br />prep <br />og <br />masonry bearing walls <br />a _. <br />m slab <br />rebadtendons <br />Q7 form deeressed areas <br />mechan ica I/e lectrical <br />Lp pour slab <br />19 stress tendons <br />~ strip forms <br />2d ~ frp columns <br />5d arcade walis <br />SEP <br />
The URL can be used to link to this page
Your browser does not support the video tag.