Laserfiche WebLink
i . . _m . ~~ ~ ~,~ <br />- -- 1--- --___---- -- _ ', ., . <br />-- _- y <br />___ <br />_____ __ _ <br />_ __ ___ , <br />-------- - - - - Estimate Date: 16-Nov-98 ~ ~~~`~ <br />ICourthouse Square Architectural Cost Consultants, LLC <br />~~ <br />!Court & High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 29-Oct-98 <br />6441 SW Canyon Court, Suite 103 Pnnt Date: 16-Nov-98 I~ <br />Salem, Oregon Print Time: 03:10 PM i <br />;Arbuckle Costic Architects, Inc Portland, Oregon 97221 <br />Phone (503 297-7210 Fax 503 297-7187 Construction Start: Spring 99 _ <br />150% Contract Documents Estimate_ _ __ __ _______. . ~ ----.--- ~ ~-- - - - - ~ <br />----- - _ __ <br />-- -- - __ <br />-- -- -- -- -_ _ __ <br />_ _--- _ _ _ _ _ _ <br />DIRECT CONSTRUCTION COST SUMMARY ~ <br />_ _ _ _ _ __ __: <br />_ . __ _ _ <br />_ _ _ -____ ____~ <br />_ _ -- - <br />_ __ <br />_ _ <br />__ ~ <br />Component Area $/ SF Cost ~ Comments ~ <br />-- __ _ __ II <br />Building Shell & Core I 152,792 sf 70.87 10,828,933 I .n ', <br />' Parking I 71,979 sf 41.80 3,008,454 a i <br />~€~~ ~~` ~ <br />I 66,528 sf 33.38 2,220,884 ~~~ ~~~ <br />Bus Mall ~ ~ <br />__ _ - ___- -- --- - ` <br />Subtotal I~ 224,77~ sf 71.a4 $16,058,271 I ~. '= I <br />' <br />Streetscape 35,650 sf 51.70 1,842,975 ~ <br />~ Subtotal 35,65o sf 51.70 $1,842,975 I <br />~ ~ <br />' Tenant Finishes ~ <br />, Ground Level Tenant Finishes 13,916 sf 52.10 725,084 <br />f 29.37 806,669 II <br />Second Floor Tenant Finishes 27,462 s <br />' Third Floor Tenant Finishes 28,062 sf 17.79 499,313 ' <br />Fourth Floor Tenant Finishes 28,062 sf 15.22 426,994 ~ <br />Fifth Floor Tenant Finishes 16,824 sf 28.15 473,588 __ __ "~ ' <br />11a,326 sf 25.6a $2,931,649 ; <br />~I TOTAL DIRECT CONSTRUCTION COST $20,832,895 I', <br />I'~ Budc~et ~I <br />- ~ ~I <br />' Indicated Surplus / (Deficit) (20,832,895) <br />- -- -~ <br />I <br />' ALTERNATES I~ <br />1 Parking Alternate 1 22,092 sf Add t 875,100 <br />2 Parking Altemate 2 19,467 sf Add t 750,200 i~ <br />' 3 0 0 <br />'~ 40 ~ <br />The above estimates are for direct construction cost only. They do not include furnishings & equipment, consultant ! <br />i fees, inspection and testing fees, plan check fees, hazardous material testing and removal, financing costs, nor any I <br />~ other normally associated development costs. <br />The above estimates assume a competitively bid project, with at least three qualified bidders in each of the major I~ <br />sub-trades as well as the general contractors. All work to be contracted at one time (shell & core, street & bus mall and I <br />~ tenant improvements). If project is to be phased, additional cost associated with phasing to be added. <br />The estimate includes a 2.5% estimating contingency. (drawings and details are not complete, complete specifications j <br />not provided for this estimate). <br />! S rin 99 If the start of construction is delayed <br />art date of: <br />ove estimates assume a construction st P 9 <br />The ab <br />xed at a rate of 4-6% er ear compounded. <br />beyond the date above, the estimates must be inde P Y ___ _ _ <br />- -- ---- <br />~..+. <br />Summary - Page 1 <br />