Laserfiche WebLink
irtho~_e Square <br />rt & High Street <br />n, Oregon <br />9cla Costic.Nrhitects, Inc <br />Contrect Dowments Estir <br />Architectur~_ „ost Consultants, LLC <br />James A JerEe, AIA - Stanley J. Psz¢alkowskl, AIA <br />6441 SW Canyon Cour~ Sulta 103 <br />PonlanQ Orapon 97221 <br />Estim. .ata'. R03-Deo-98 <br />Docvmant Data: 29-Otl-98 <br />Print ~ete: 03-Dau98 <br />PrintTlme: 11:W AM <br />I DIRECT CONSTRUCTION COST - PARTNERS SUMMARY I <br />Component Area Bidg S& C Conferenee Ctr. County Solid Waste Transit Parking Bus Mail Streetscape Totals Comments <br />BuildingShell&Core 152,792sf 7t,308,712 0 25,989 0 25,989 0 0 0 E7~.360,69~ <br />parkin9 77,979 st 0 0 457,677 0 457,677 2,416,574 0 0 E3.331,929 <br />Bus Mall 66,528 sf - 0 0 0 0 0 0 2,175,377 0 52,~75,371 <br />StreetScape 35,650 sf 0 0 0 0 0 0 0 1,789,777 51,789,777 <br />Tenant Finishes <br />Counry 85,725 sf 0 0 1,795,699 0 0 0 0 0 E1,795,699 <br />Transit 17,784 sf 0 0 0 0 692,788 0 0 0 §692,798 <br />Solid Waste 5,866 sf 0 0 0 748,190 0 0 0 0 E148,190 <br />Conference Center 4,951 sf 0 278,264 0 0 0 0 0 0 E278,264 <br />TOTALDIRECTCONSTRUCTIONCOST 11,308,712 278,264~ 2,279,366 148,790 1,776,455I 2,476,574~ 2,175,371I 1,789,777I SZ~,572,709 <br />cost/sf 574.01 $56.20 $26.59 S25.26 366.15 533.57 832.70 350.20 <br />Building Shell & Care E11,308,712 <br />parking 52,416,574 <br />Bus Mail E2.175,371 <br />SVeet Scape 51,789,777 <br />Counry E2,279,366 <br />Transit 51,176,455 <br />Solitl Waste 5148,190 <br />Conferenoe Center 5278,264 <br />521,572,709 <br />ALTERNATES Bld 5& C Conference Ctr. Coun Solid Waste Transit Parkin Bus Mall Streetsca e Tatals <br />1 Parking Altemate 1 22,092 sf 0 0 6,488 0 6,488 975,295 0 0 5988,271 <br />2 Parking Altemate 2 19,467 sf 0 0 0 0 0 849,921 0 0 8849,921 <br />3 0 sf ~ <br />4 0 Sf ~ <br />The above estimates are for direM constrvction cost only. They do not inGude furnishings & equipment, consultant fees, inspection and testing fees, plan check fees, hazardous material testing and <br />removal, fnancing costs, nor any other normally associated development wsts. <br />The above estimates assume a competitively bitl projecl. with at least three qualified bidders in each ot the major sub-trades as well as the general contractors. All work to be contrected at one time <br />(shell 8 core, street & bus mall antl tenant improvements). If projeM is to be phased, additional cost associated with phasing to be addetl. <br />The above estimates assume a constrvclion start date of: Spnng 99 Ii the start oi construdion is delayed beyontl this date, the estimates must be indexed at a rete of 2 to 4% per year compounded. <br />Partner Summary <br />