My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Financial- Melvin Mark (Files 1-2)
>
CS_Courthouse Square
>
Financial- Melvin Mark (Files 1-2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 2:34:31 PM
Creation date
8/23/2011 4:16:46 PM
Metadata
Fields
Template:
Building
RecordID
10205
Title
Financial- Melvin Mark (Files 1-2)
Company
Marion County
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Finance
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
511
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. <br />problem with accommodating this, but NIl~IDC cautioned to not compact it too much because of <br />unforeseen conditions that may arise. MNIDC will be doing the building commissioning and as long as <br />Pence/Kelly is coordinated on these efforts, they have no problems. <br />The best option for move-in is to work from the top floor down, but we may have to go ground floor up. <br />Another option is to not put in all TI's on the leased space if a tenant has not been identified. The design <br />allows this space to stand alone without TI's. The mechanicaUelectrical risers would need to be <br />completed prior to move-in phase. A critical issue to keep in mind during this phase as departments <br />move in would be to have support systems in place and remaining construction work does not interfere <br />with their normal business practices. We need to assess logical moves that will work. Sound will be a <br />major issue. The best scenario would be to have a couple floors separation between departments that <br />have moved in and the rest of the constcuction on TT's. Use of one elevator as construction use only <br />during this phase will also help. <br />County's time sensitive lease is the Annex building out on Lancaster. These departments will occupy <br />about 3/4 of one floor. It has a May 1~`, 1998 expiration date, with a month to-month lease after that <br />date. Some county departments can be delayed without financial penalties. Transit also is under no <br />timing constraints on theu move either. <br />Budget <br />Dave had prepared 5 separate handouts outlining shell, parking, bus mall, streetscape costs and a <br />summary sheet. The summary is missing TI numbers because they didn't know what would be done. <br />The only changes in the shell package from last submission was to add the following items: site utilities, <br />allowance for nice entry items and a generator vault. He did increase the cost/foot on brick. The <br />parking garage stayed the same. The bus mall had a mistake last time and didn't include foundation <br />items in the estimate. <br />Streetscape also had a big change. There is more surface area and we included steel trusses for the <br />azcade. The division of lines may not be separated cornectly. Dave and Leonard worked together to <br />include items in streetscape. There are areas in this estimate that can be trimmed. The canopies on <br />Church and H'igh in front of the security gates were included, but if streetscape funds won't cover this <br />item, it will have to be included in tiansit's costs. It looks like we have about a half a million in cost <br />over the amount the city has reserved for streetscape. The $2 million is there, it is just a matter of <br />whether they will part with it or not. Discussion of the storm sewer upgrade and how it fit into the <br />streetscape budget also took place. With design change on parking, we just need to cross the intersection <br />with the storm sewer line. Bob McCune has worked with PGE and we will have power coming into the <br />site from two locations for better service. <br />Dave used a drawing to illustcate how the common wall on the north retail section and bus mall was <br />calculated into the bus mall price. It was noted that if successfully negotiated with the retail developer, <br />some of the costs can be recouped. Transit would still have to put tile on their side of the wall. <br />Of a11 the costs, streetscape is the loosest. We can do streetscape for the dollars that aze allocated if we <br />need to. Dave had very little structural input from Mike Hayford in his estimates. He worked off <br />previous scheme which shouldn't be too faz of~ Dave and Leonazd will try and get more answers from <br />Hayford next week to get as tight as we can on the shell and parking costs. <br />We have targeted the 5 story version, but it looks like we may still be about $2 million over on this <br />budget. We still have areas to look at to bring costs down. The skin treatment, concrete vs. steel, and <br />size of building are all still issues to be refined. There may be some costs savings resulting in <br />f'age 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.