Laserfiche WebLink
<br />Steve Ward <br />Apri128, 1999 <br />Page 3 <br />Submit one set of revised plans to all utility companies. All costs for relocation of existing <br />utilities shall be borne by the developer. <br />The consulting engineer shall be responsible for providing all surveying services necessary to <br />stake the project prior to construction and to prepare the as-built drawings when the project is <br />complete. <br />Construction must meet City of Salem Standard Construction Specifications as to materials and <br />workmanship. <br />Please note that the City has a standard requiring installation of water services by the developer. <br />This Standard #410 (for 5/s" and 1" meters), #419 (for 1%2" and 2" meters), or #506 (for meters <br />larger than 2") is available at the Public Works Deparkment, Room 325. <br />Water used on this project will not be furnished by the City of Salem. Water may be purchased <br />and obtained through a metered fire hydrant convenient to the construction site. Authorization <br />and arrangements can be made by calling the Development Services Section at (503) 588-6211, <br />24 hours in advance of your needs. Water may also be purchased from a bulk water station. <br />All tapping, installation'of valves on existing municipal pressurized water mains, chlorination <br />and purity tests must be done by City forces. An estimate of expected costs for the above work <br />may be requested by calling the Development Services Section at (503) 588-6211. A deposit for <br />the full amount established must be received by the Public Works Department prior to City <br />forces performing the work. Any additional charges for tapping or chlorination must be paid <br />prior to closing of the project. ' <br />Per Salem Revised Code Section 77.120, the engineer shall, prior to final acceptance and the start <br />of the one-year warranty period, furnish five rolled sets of good quality blackline prints of as- <br />built drawings for each construction phase, i.e., sewer, water, storm drain, and/or street <br />improvement, and all required easements. <br />Criteria for acceptable "as-built" drawings may be obtained by calling the Construction <br />Inspection Section at (503) 588-6211. Our "Acceptance for Completion" letter will state the <br />dates of the one-year warranty period. At the close of the successful warranty period, you will <br />receive a letter of "Final Acceptance." <br />Check valves must be installed to Public Works Department Standards. Devices must be tested <br />by a certified tester and reported to 1410 20th Street SE, Building #2, Salem, Oregon 9730~, <br />before protection is recognized. For infQrmation, call (503) 588-6063. <br />The system will not be activated until our receipt of this data. <br />PD:P:~986020.,~ee <br />