My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Financial- Foss Environmental Svcs. Co.
>
CS_Courthouse Square
>
Financial- Foss Environmental Svcs. Co.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 2:53:58 PM
Creation date
8/26/2011 2:40:47 PM
Metadata
Fields
Template:
Building
RecordID
10178
Title
Financial- Foss Environmental Svcs. Co.
Company
Marion County
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Finance
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
613
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~~ri ~I' <br />Soil Removal/Investigation: There are five azeas of known petroleum- <br />contaminated soil (PCS) on the subject property. The PCS will be excavated, <br />transported to an off-site disposal facility, and confirmation samples collected and <br />analyzed. Two potential sumps will be excavated and investigated. <br />Dispose of Pre-Existing Petroleum Contaminated Soil: Transport to a County- <br />specified disposal facility five (5) 55-gallon drums containing petroleuxn <br />contaminated soil generated during on-site investigation activities. Engineer will <br />provide soil analytical data to Contractor. <br />1.2 PERMITS <br />A. Obtain all permits required for this work. <br />1.3 INSPECTION OF WORK AREA <br />A. Examine the work azea and become satisfied as to the conditions of the work <br />involved and the quantities of materials required for the performance of the <br />work. <br />1.4 VERIFICATION OF MEASUREMENTS <br />A. Verify measurements and be responsible that executed dimensions fit actual <br />conditions, regazdless of the drawings, and report discrepancies to the Engineer <br />before proceeding with the work. The Contractor will not receive extra <br />compensation for verification of ineasurements or for labor or material expended <br />on account of such differences. <br />1.5 MEASUREMENT AND PAYMENT <br />A. All work described in this section is considered incidental work for which no <br />separate payment will be made. <br />END OF SECTION <br />Summary of Work 01010-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.