My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Financial- Geotechnical Resources Inc.
>
CS_Courthouse Square
>
Financial- Geotechnical Resources Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 2:58:49 PM
Creation date
8/29/2011 3:21:06 PM
Metadata
Fields
Template:
Building
RecordID
10183
Title
Financial- Geotechnical Resources Inc.
Company
Marion County
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Finance
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
'~.r <br />l~larion County <br />OREGON <br />RISK MANAGEMENT <br />MANAGER <br />David M. Hartwig <br />(503) 588-5294 <br />BOARD OF <br />COMMISSIONERS <br />Randall Franke <br />Gary Heer <br />Mary Pearmine <br />ADMINISTRATIVE <br />OFFICER <br />Ken Roudybush <br />~ <br />June 17 1997 <br />Marion County Board of Commissioners <br />Marion County Courthouse <br />Salem OR 97301 <br />Dear Members of the Board: <br />In accordance with the Marion County Contract Review Board Rules, I am <br />requesting an exemption from the competitive process for a contract with <br />Geotechnical Resources Incorporated (GRI) for design of a construction <br />dewatering system of the Courthouse Square Project. The scope of work includes <br />placement of a test well that will provide data to be used to develop the design and <br />construction specifications for the dewatering system. This exemption is <br />requested for the base contract amount of $20,000 and any further amendments <br />required to complete the dewatering system. <br />This exemption is being requested under Section 9 of the Contract Review Board <br />Rules which states: <br />* It is unlikely that the exemption will encourage favoritism or <br />substantially diminish competition, and <br />The contract will result in substantial cost savings to the county. <br />It is unlikely that the exemption will encourage favoritism or substantially <br />diminish competition. We currently have a contract in place with Century West <br />Engineering for environmental engineering services. As part of this contract, <br />Century West Engineering, as our agent, has selected GRI for this design aspect of <br />the project. This selection was based upon Century West's knowledge of GRI's <br />professional abilities and GRI's availability to do the project under the current <br />time constraints. Under normal circumstances, we would request written <br />proposals and are only asking for this exemption due to the importance of <br />obtaining this information so the construction is not delayed. This exemption <br />does not change our standard practice of the competitive bidding process. <br />Marion County Courthouse • 100 High St. N.E. • Salem, Oregon 97301 <br />
The URL can be used to link to this page
Your browser does not support the video tag.