~ Demolition Bids: Leonard said that their preference is that their involvement inj the demolition <br />~~,, be minimal. They have talked about how they will bid this. Dan suggested h~ving the same <br />company do the abatement and the demolition. This will limit the competition make the bid <br />process smoother. He suggested that it may be prudent to have CenturyWe t bid on this. <br />CenturyWest has the language for the RFP. They have submitted some potential work orders to <br />oversee the cleanup. From a liability standpoint, Dan is going to advise the county to do this. It was <br />asked if it is worth it for us to pay to have someone sit on the site assuring that the di soil is going <br />into the right truck. Dan said that it makes sense to have a consultant on si e, not just for <br />contaminated soil, but also for abatement. ! <br />Randy reported that Jim Sears, from Marion County Solid Waste, has approval to use Brown's Island <br />as a staging site. Dan stated that he expects DEQ to shoot this down immediately. J' wants to use <br />the good soil as cover. The issue will be that we are putting contaminated soil in a fl od plain. This <br />is not good press. Dan will let Kathy know so she will be up to speed. ~i <br />It is Question was raised as to how the consultants will be chosen. Dan said that f concerns are <br />raised, then it becomes a team issue. Kim said that he has concerns around Cen West being <br />selected. Dan said that the meeting on Monday is preliminary. He would like us to ntinue on this <br />path and then address issues later. Referring to structural design, not civil, Curt s id that he has <br />worked with one person CenturyWest who has experience. Dan said that after the M nday meeting, <br />everyone can sit down and walk through the concerns and make team decisions on e selection of <br />the consultants. I <br />~ Curt also pointed out a fifth floor cost issue. The fifth floor adds si nificant wei ht t the structure. <br />g g <br />These costs will be attributed to Dan and his fifth floor. The estimate is at $650 - SOk. The first <br />bid was $800k. This is a possible savings. ~ <br />Dan said that we are still waiting for the contract between him and the county to be s'gned, but they <br />are still two weeks away from signing. Randy said that he had expected a draft by t day. It is near <br />completion. Dan had expected this to be done before this meeting. All the points wer resolved four <br />weeks ago. Now he is concerned with how we circumvent going further without a contract. Dan <br />still has to sit down with his attorney and review the revised contract. Kim said that ey are willing <br />to go forward without a contract, but when they begin working with the engineers ey must have <br />a contract. Leonard suggested a letter-of-intent. Dan said that he and RG, Randy will sit down a talk <br />about this after this meeting. I <br />Kim said that the structure is extremely important at this time. The time frame is v ry tight. Dan <br />stated that he is optimistic and is ready to move forward with the design decisions. ~G guaranteed <br />that he will have the contract signed on his side wrthin 24 hours. ' <br />Property Acquisition: This item was dealt with in yesterday's meeting. ~~ <br />Financing: Dan stated that there are some benefits in the fifth floor, but he is not ~eady to report <br />on this at this time. <br />~ <br />