Courthouse Square
<br />Court & High Street
<br />Salem, Oregon
<br />Arbuckle Costic Architects, Inc
<br />Design Development Probable Cost Estimate
<br />Ground Level
<br />Second Floor
<br />Third Floor
<br />Fourth Floor
<br />Fifth Floor
<br />Penthouse
<br />Total Gross Area
<br />Buildin~ Shell 8 Core
<br />CONCRETE - Continued
<br />redi-mix concrete
<br />spread footings 3000 psi
<br />mat footing 3000 psi
<br />continuous footing 3000 psi
<br />slab on grade 4000 psi
<br />columns
<br />parking level 5000 psi
<br />building 5000 psi
<br />shear walls above parkin 5000 psi
<br />parking level 5000 psi
<br />elevator pit 5000 psi
<br />beams 5000 psi
<br />supported slab 5000 psi
<br />curbs 5000 psi
<br />Subtotal - Redi-Mix Concrete
<br />finishing
<br />set screeds
<br />cure
<br />seal
<br />trowel
<br />float footings
<br />break ties & plug voids @ walls
<br />Subtotal
<br />Architectural Precast Concrete
<br />below ground floor windows
<br />base @ building & arcade columns
<br />Subtotal
<br />TOTAL-CONCRETE
<br />_ _ . _ --- --- -- - - _ -- ------ - - - - ---
<br />Architectural Cost Consultants, LLC
<br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA
<br />6441 SW Canyon Court, Suite 103
<br />Portland, Oregon 97221
<br />Phone (503)297-7210 Fax (503)297-7187
<br />~ _ __ _.___ _-
<br />I 23,249
<br />~ 32,088
<br />, 32,088
<br />I 32,088
<br />32,012
<br />1.818
<br />-- _ _-
<br />153,343
<br />Quantity Unit CosUUnit Cost Total
<br />~ _ _ - ___ _-- -- --- - -
<br />464 cy 54.00 25,056
<br />409 cy 54.00 22,086
<br />0 cy 54.00 0
<br />0 cy 58.00 0
<br />45 cy 64.00 2,880
<br />141 cy 64.00 9,024
<br />691 cy 64.00 44,224
<br />123 cy 64.00 7,872
<br />24 cy 64.00 1,536
<br />0 cy 64.00 0
<br />4,998 cy 64.00 319,872
<br />0 cy 64.00 0
<br />6,895 cy 432,55a
<br />154,284 sf 0.20 30,857
<br />154,284 sf 0.08 12,343
<br />154,284 sf 0.06 9,257
<br />154,284 sf 0.60 92,570
<br />9,064 sf 0.40 3,626
<br />31,979 sf 0.55 17,588
<br />166,241
<br />674 sf 0.00 0
<br />1,632 sf 40.00 65,280
<br />65,280
<br />_ _ . _ 52,575,291
<br />_ - - --
<br />Estimate Date: R21-Aug-98
<br />~ Document Date: 23-Ju1-98
<br />~ Print Date: 21-Aug-98
<br />~ Print Time: 11:20 AM
<br />I Construction Start: Spring 99
<br /> 25,056
<br /> 22,086
<br /> 0
<br /> 0
<br /> 2,aso
<br /> 9,024
<br /> aa.22a
<br />3,936 3,936 0
<br /> 1,536
<br /> 0
<br /> 319,872
<br /> 0
<br />3,936 3,936 0 0 424,678
<br /> 30,857
<br /> 12.343
<br /> 9,257
<br /> 92,570
<br /> 3,626
<br />1,159 1,159 15,270
<br />1,159 1,159 0 0 163,922
<br /> 0
<br /> 65,280 I
<br />SO $0 $0 $0 $65,280
<br />~22,943 322,943 SO $0 a2.529,405
<br />_ __ -_ _.._ _ _ _ _.
<br />Comments
<br />see parking estimate
<br />see parking estimate
<br />:hange to 8" x 8" tile w/ cmu
<br />16.79
<br />Building Shell 8 Core Detail Estimate - Page 4