Laserfiche WebLink
Courthouse Square <br />Court & High Street <br />Salem, Oregon <br />Arbuckle Costic Architects, Inc <br />Design Development Probable Cost Estimate <br />Ground Level <br />Second Floor <br />Third Floor <br />Fourth Floor <br />Fifth Floor <br />Penthouse <br />Total Gross Area <br />Buildin~ Shell 8 Core <br />CONCRETE - Continued <br />redi-mix concrete <br />spread footings 3000 psi <br />mat footing 3000 psi <br />continuous footing 3000 psi <br />slab on grade 4000 psi <br />columns <br />parking level 5000 psi <br />building 5000 psi <br />shear walls above parkin 5000 psi <br />parking level 5000 psi <br />elevator pit 5000 psi <br />beams 5000 psi <br />supported slab 5000 psi <br />curbs 5000 psi <br />Subtotal - Redi-Mix Concrete <br />finishing <br />set screeds <br />cure <br />seal <br />trowel <br />float footings <br />break ties & plug voids @ walls <br />Subtotal <br />Architectural Precast Concrete <br />below ground floor windows <br />base @ building & arcade columns <br />Subtotal <br />TOTAL-CONCRETE <br />_ _ . _ --- --- -- - - _ -- ------ - - - - --- <br />Architectural Cost Consultants, LLC <br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA <br />6441 SW Canyon Court, Suite 103 <br />Portland, Oregon 97221 <br />Phone (503)297-7210 Fax (503)297-7187 <br />~ _ __ _.___ _- <br />I 23,249 <br />~ 32,088 <br />, 32,088 <br />I 32,088 <br />32,012 <br />1.818 <br />-- _ _- <br />153,343 <br />Quantity Unit CosUUnit Cost Total <br />~ _ _ - ___ _-- -- --- - - <br />464 cy 54.00 25,056 <br />409 cy 54.00 22,086 <br />0 cy 54.00 0 <br />0 cy 58.00 0 <br />45 cy 64.00 2,880 <br />141 cy 64.00 9,024 <br />691 cy 64.00 44,224 <br />123 cy 64.00 7,872 <br />24 cy 64.00 1,536 <br />0 cy 64.00 0 <br />4,998 cy 64.00 319,872 <br />0 cy 64.00 0 <br />6,895 cy 432,55a <br />154,284 sf 0.20 30,857 <br />154,284 sf 0.08 12,343 <br />154,284 sf 0.06 9,257 <br />154,284 sf 0.60 92,570 <br />9,064 sf 0.40 3,626 <br />31,979 sf 0.55 17,588 <br />166,241 <br />674 sf 0.00 0 <br />1,632 sf 40.00 65,280 <br />65,280 <br />_ _ . _ 52,575,291 <br />_ - - -- <br />Estimate Date: R21-Aug-98 <br />~ Document Date: 23-Ju1-98 <br />~ Print Date: 21-Aug-98 <br />~ Print Time: 11:20 AM <br />I Construction Start: Spring 99 <br /> 25,056 <br /> 22,086 <br /> 0 <br /> 0 <br /> 2,aso <br /> 9,024 <br /> aa.22a <br />3,936 3,936 0 <br /> 1,536 <br /> 0 <br /> 319,872 <br /> 0 <br />3,936 3,936 0 0 424,678 <br /> 30,857 <br /> 12.343 <br /> 9,257 <br /> 92,570 <br /> 3,626 <br />1,159 1,159 15,270 <br />1,159 1,159 0 0 163,922 <br /> 0 <br /> 65,280 I <br />SO $0 $0 $0 $65,280 <br />~22,943 322,943 SO $0 a2.529,405 <br />_ __ -_ _.._ _ _ _ _. <br />Comments <br />see parking estimate <br />see parking estimate <br />:hange to 8" x 8" tile w/ cmu <br />16.79 <br />Building Shell 8 Core Detail Estimate - Page 4 <br />~ ~ ~ <br />