My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Design Development Construction Cost Estimate
>
CS_Courthouse Square
>
Design Development Construction Cost Estimate
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:08:30 AM
Creation date
9/6/2011 10:32:45 AM
Metadata
Fields
Template:
Building
RecordID
10335
Title
Design Development Construction Cost Estimate
Company
Architectural Cost Constultants
BLDG Date
8/21/1998
Building
Courthouse Square
BLDG Document Type
Design - Planning
Project ID
CS9601 Courthouse Square Research
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ ~ ~ ~ ~ <br />Courthouse Square <br />Court 8~ High Street <br />Salem, Oregon <br />Arbuckle Costic Architects, Inc <br />Design Development Probable Cost Estimate <br />Ground Level <br />Second Floor <br />Third Floor <br />Fourth Floor <br />Fifth Floor <br />Penthouse <br />Total Gross Area <br />~Buildin~ Shell & Core <br />~ CONCRETE - Continued <br />R/S - Continued <br />supported slab <br />post tension (unbonded) <br />' r/s <br />I curbs <br />~I Subtotal - Reinforcing Steel <br />li placing <br />, spread footings <br />mat footing <br />' continuous footing <br />~ slab on grade <br />columns <br />parking level <br />building <br />; shear walls above parking level <br />!I parking level <br />elevator pit <br />beams <br />; supported slab <br />' curbs <br />pumping <br />; Subtotal - Placing <br />~ ~ ~ ~ ~ ~ ~ ~ ~ <br />- - -- ___ _---- - <br />Architectural Cost Consultants, LLC <br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA <br />6441 SW Canyon Court, Suite 103 <br />Portland, Oregon 97221 <br />Phone (503)297-7210 Fax (503)297-7187 <br />- - ---- <br />23,249 <br />32,088 <br />32,088 <br />32,088 <br />32,012 <br />1,818 <br />153,343 <br />Quantity Unit CosUUnit Cost Total <br />194,397 Ibs 2.15 417,954 <br />218,705 Ibs 0.58 126,849 <br />Ibs 0.60 0 <br />_ _ _ - <br />728,787 <br />464 cy 18.00 8,352 <br />409 cy 12.00 4,908 <br /> cy 17.00 0 <br /> cy 16.00 0 <br />45 cy 32.00 1,440 <br />141 cy 32.00 4,512 <br />691 cy 28.00 19,348 <br />123 cy 28.00 3,444 <br />24 cy 35.00 840 <br /> cy 45.00 0 <br />4,998 cy 16.00 79,968 <br />0 cy 50.00 0 <br />6,895 cy 10.00 68,950 <br />- __ _ _ --- -- <br /> 191,762 <br />~ ~ ~ ~ ~ <br />Estimate Date: R21-Aug-98 <br />Document Date: 23-Ju1-98 <br />Print Date: 21-Aug-98 <br />Print Time: 11:20 AM <br />Construction Start: Spring 99 <br /> a77,95a <br />126.849 <br />0 <br />4,233 4,233 0 0 720,321 <br /> 8,352 <br /> 4,908 <br /> 0 : <br /> o ~ <br /> 0 <br /> 1,440 <br /> 4,512 <br /> 19,348 <br />1,72z 1.722 0 <br /> 840 <br /> or <br /> 79,968 <br /> 0 <br />615 615 67,720 <br />2,337 2,337 0 0 187,088 <br />- _ <br />_ Comments <br />ee parking estimate <br />ee parking estimate <br />nc <br />Building Shell & Core Detail Estimate - Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.