My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Design Development Construction Cost Estimate
>
CS_Courthouse Square
>
Design Development Construction Cost Estimate
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:08:30 AM
Creation date
9/6/2011 10:32:45 AM
Metadata
Fields
Template:
Building
RecordID
10335
Title
Design Development Construction Cost Estimate
Company
Architectural Cost Constultants
BLDG Date
8/21/1998
Building
Courthouse Square
BLDG Document Type
Design - Planning
Project ID
CS9601 Courthouse Square Research
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Courthouse Square <br />Court & High Street <br />Salem, Oregon <br />Arbuckle Costic Architects, Inc <br />Design Deveiopment Probable Cost Estimate <br />Ground Level <br />Second Floor <br />Third Floor <br />Fourth Floor <br />Fifth Floor <br />Penthouse <br />Total Gross Area <br />'Buildin~ Shell S Core <br />MOISTURE - THERMAL CONTROL - Cc <br />Flashing & Sheet Metal <br />gutters <br />downspouts <br />scuppers <br />flashing <br />parapet cap <br />@ bay windows <br />building <br />penthouse <br />parapet backing <br />miscellaneous <br />Subtotal <br />Skylights / Canopies <br />north elevation <br />east elevation <br />south elevation <br />west elevation <br />fifth floor canopies / sun screens <br />Subtotal <br />Caulking & Sealants <br />caulking / sealants <br />Subtotal <br />TOTAL - MOISTURE - THERMAL COI <br />Architectural Cost Consultants, LLC <br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA <br />6441 SW Canyon Court, Suite 103 <br />Portland, Oregon 97221 <br />Phone (503)297-7210 Fax (503)297-7187 <br />__ __ __ ._ <br />23,249 _ _ _ - <br />32, 088 <br />32,088 <br />32,088 <br />32,012 <br />1,818 <br />-- _ <br />153,343 <br />Quantity Unit CosUUnit Cost Total <br />If 0.00 0 <br />60 If 10.00 600 <br />4 ea 175.00 700 <br />100 If 13.00 1,300 <br />812 If 10.00 8,120 <br />507 If 10.00 5,070 <br />2,842 sf 3.50 9,947 <br />1 sum 3,000.00 3,000 <br />28,737 0 0 0 0 <br />sf 0.00 0 <br />sf 0.00 0 <br />sf 0.00 0 <br />sf 0.00 0 <br />sf 0.00 0 <br />ol ol ol o <br />153,343 sf 0.20 30,669 <br />30,669 50 $o ;o <br />"ROL a395,126 ~0 So ~o <br />Estimate Date: R21-Aug-98 <br />Document Date: 23-Ju1-98 <br />Print Date: 21-Aug-98 <br />Print Time: 11:20 AM <br />Construction Start: Sprin~ 99 <br />Comments <br />0 NIC <br />600 penthouse to roof level <br />700 <br />1,300 <br />8,120 <br />5,070 <br />9,947 <br />3,000 <br />28,737 <br />o NIC w/ bus mall <br />o NIC w/ streetscape <br />o NIC w/ streetscape <br />0 NIC w/ streetscape <br />o NIC <br />0 <br />SO 530,669 <br />$o a395,126 2.58 <br />Building Shell & Core Detail Estimate - Page 8 <br />~ ~ _ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ _ ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.